1.  Product Table 

 

Unit Type Code 

Nominal 

Input 

Voltage 

Chamber 

Beacon 

Nominal 

Input Current

 

Cover Beacon 

Nominal 

Input Current

Max I/P Voltage  

BExCBG05-05DPDC012 

12Vdc 

750mA

750mA

14V 

BExCBG05-05DPDC024  

24Vdc 

300mA

300mA

28V 

BExCBG05-05DPDC048  

48Vdc 

180mA

180mA

54V 

BExCBG05-05DPAC115  

115Vac 

140mA

140mA

126V 

BExCBG05-05DPAC230  

230Vac 

55mA

55mA

253V 

The table shows the input current taken by the various units. 
Nominal current at nominal voltage. 
Table 1: Electrical Ratings. 

 

It is important that a suitable power supply is used to run the equipment. The power supply selected must have the necessary capacity 
to provide the input current to all of the units. 

 

The above table shows the input current taken by the various units and shows the maximum voltage at which they can be operated: 

 

The input current will vary according to the voltage input level an flash rates selected. 

 

2.  Warnings 

  

 

  DO NOT OPEN WHEN AN EXPLOSIVE ATMOSPHERE IS PRESENT 

  DO NOT OPEN WHEN ENERGIZED 

  POTENTIAL ELECTROSTATIC CHARGING HAZARD – CLEAN ONLY WITH A  DAMP CLOTH 

  COVER BOLTS CLASS A4-80 

  USE HEAT RESISTING CABLES AND CABLE GLANDS (RATED 110°C) AT AMB. TEMPERATURES OVER 

40°C 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for BExCBG05-05D-P

Page 1: ...A 55mA 253V The table shows the input current taken by the various units Nominal current at nominal voltage Table 1 Electrical Ratings It is important that a suitable power supply is used to run the e...

Page 2: ...n normal operation and if it does it will only exist for a short time Gas Groupings Group IIA Propane Group IIB Ethylene Group IIC Hydrogen Acetylene Temperature Classification for Gas Applications T1...

Page 3: ...to ensure that the unit cannot move in service Fig 1 Fixing Location for Combined Beacon Beacon 7 Access to the Flameproof Enclosure To access the Ex d chamber remove the four M6 hexagon socket head...

Page 4: ...ls which are both located on the terminal chamber section of the unit Fig 3 Internal View of Cover When using the internal earth terminal ensure that the stainless steel M4 flat washer is between the...

Page 5: ...s in total Apply Power to Stage 1 Live Stage 1 Neutral Fig 4a Chamber AC Terminals Fig 4b Cover AC Terminals 12 DC Wiring A 4 way terminal block is provided on the DC chamber beacon for power There ar...

Page 6: ...D210 06 205 If the chamber and cover sections are connected to the same input supply The incoming cables should be connected to the input terminals on the cover section beacon board and the two link w...

Page 7: ...Repair Maintenance repair and overhaul of the equipment should only be carried out by suitably qualified personnel in accordance with the current relevant standards EN60079 19 IEC60079 19 Explosive at...

Page 8: ...HT Kg SURFACE FINISH MATERIAL ALTERNATIVE MATERIAL SHEET SCALE TITLE A3 IF IN DOUBT ASK DO NOT SCALE ALL DIMENSIONS IN MM DRAWING NUMBER A B C D E F G 10 9 G F E 7 8 6 5 D C 1 3 4 2 A B D210 06 701 R...

Page 9: ...TE ISSUE DATE APPROVED CHECKED DATE DATE DRAWN WEIGHT Kg SURFACE FINISH MATERIAL ALTERNATIVE MATERIAL SHEET SCALE TITLE A3 IF IN DOUBT ASK DO NOT SCALE ALL DIMENSIONS IN MM DRAWING NUMBER A B C D E F...

Page 10: ...ality Assurance Notification ModuleD SIRA 05 ATEX M342 Provisions fulfilledby theequipment II 2G Ex db IIB T6 to T4 Gb II 2D Ex tb IIIC T65 C to T130 CDb IP6X Dust Protectionto EN60079 0 EN60079 31 St...

Page 11: ...r Date andPlace of Issue London 23 12 2020 EU Declaration of Conformity On behalf of European SafetySystems Ltd I declarethat on the date the equipment accompanied by this declaration is placed onthem...

Page 12: ...Chester CH4 9JN UK Quality Assurance Notification Module D CSAE 22UKQAN0046 Provisions fulfilled by the equipment II 2G Ex db IIB T6 T4 Gb II 2D Ex tb IIIC T65 C T130 Db IP6X Dust Protection to EN6007...

Page 13: ...and Place of Issue London 12 09 2022 UKCA Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed on the m...

Page 14: ...Page left Intentionally blank...

Page 15: ...Page left Intentionally blank...

Page 16: ...Page left Intentionally blank...

Reviews: