E-XTEQ E-VLT Quick Start Manual Download Page 1

QSG-EVLT-00449_R00_XXXX00_01_EN_2022-11-02

 

E-VLT

Quick Start Guide 

Summary of Contents for E-VLT

Page 1: ...QSG EVLT 00449_R00_XXXX00_01_EN_2022 11 02 E VLT Quick Start Guide ...

Page 2: ...NNECTORS 7 DIGITAL LINKS 7 User interface 8 OVERVIEW 8 KEYS 8 Cycle keys 8 Keys 8 POWER UP 9 MAIN MENU screen 9 PREPARING A PROGRAM 10 PREPARING A BATTERY GROUPS PROGRAMS 11 SELECTING A BATTERY TO TEST 11 STARTING AND STOPPING CYCLE 12 Starting a measurement cycle 12 Measurement cycle screen 12 Stopping a cycle 13 User adjustments 14 PROGRAM PARAMETERS 14 BATTERY PARAMETERS 15 CONFIGURATION MENU 1...

Page 3: ...usly work on improving our products This is why information contained in this man ual the device and the technical specifications may be modified without prior notification Pictures and figures in this manual are non contractual E XTEQ 30 rue des Dames Z I 78340 LES CLAYES SOUS BOIS FRANCE e xteq com Tél 33 1 30 07 1330 ...

Page 4: ...able standards and rules To avoid electromagnetic interference electrical connections to the device must be shorter than 2 meters Power supply plug must be grounded Disconnect the device from the mains before performing any maintenance work Shut off the compressed air supply when working on the pneumatic assembly Do not open a connected device Avoid splashing water on the device E XTEQ is at your ...

Page 5: ...LT can memorise 128 different test programs and 32 batteries sets of programs LEAK TEST Leak test and Desenzitizes Mode The test pressure is applied to the input of the test part 3 The measurement is performed by the pressure sensor 2 1 Device 2 Pressure sensor 3 Part under test Desensitized Mode there is no leak fullscale The limit is the test Pressure ...

Page 6: ...G EVLT 00449_R00_XXXX00_01_EN_2022 11 02 5 17 PRINCIPE OF CYCLE The measurement cycle is made of 4 mains phases fill stabilization test dumping 0 Waiting phase 1 Fill phase 2 Stabilization phase 4 Dumping ...

Page 7: ...FRONT PANEL The user interface is located on the front panel 1 Touchscreen Display 2 USB Connectors BACK PANEL 1 Part number Serial number 2 Exhaust output 3 Test part connector 4 Calibration informations 5 Connector for 100 240 V AC power supply 1 2 1 4 5 3 2 ...

Page 8: ... electric hazard or electrocution Interruptor ON OFF 1 ON 0 OFF DIGITAL LINKS PC USB connectors on front face USB connectors can be used for connecting miscellaneous compatible USB devices The USB connectors are located under the rubber cover 1 see figure 1 USB connector to PC 2 USB connector to USB key or barcode reader 3 Rubber cover Do not use a cable longer than 2 m Push the rubber cover 3 sli...

Page 9: ... stop a measurement cycle Keys The navigation keys are used to select menus options and change parameter values Key Name Function Start Starts a measurement cycle and opens the Measurement cycle screen Reset Stops the measurement cycle in progress Key Name Function OK Validation of actual screen Back Returns to previous screen ...

Page 10: ... your device When Power up part under pressure must NOT be connected to the instrument Then the instrument propose an autotest MAIN MENU screen The MAIN MENU screen gives access to different sections for managing the device and the test parameters 1 Battery selection and test Menu 2 Results Menu 3 Instrument configuration 1 3 2 ...

Page 11: ... Parameters Menu requires Expert Rights The program list is displayed 1 Home returns to main menu 2 Group parameters Batteries 3 Programs parameters 4 Special cycles Autozero 5 Configuration 3 Select the program number you want to edit 4 Modify parameters For more details refer to chapter User Adjustment Program parameters 5 Press Home to come back to main menu 1 3 2 4 5 ...

Page 12: ...u want to edit 3 Modify parameters For more details refer to chapter User Adjustment Battery parameters 4 Press HOME to come back to main menu SELECTING A BATTERY TO TEST 1 Select Battery Menu 2 Select Battery list Menu 3 Select the correct battery in the list 4 Select TEST TYPE Housing or Cooling Prepare and connect the correct coupler ...

Page 13: ... or last one 1 Battery Name 2 Step progress 3 Battery type of test 4 Cloud connection Not available yet 5 User Right Normal Expert 6 Pressure or Leak measurement 7 Cycle step Fill Stab Test Dump Ready 8 Bargraph Pressure according to target or leak according to reject level 9 Result of the test Pass Fail Alarm code 10 Countdown Bargraph 11 Time remaining to finish test 12 In the center When ready ...

Page 14: ...QSG EVLT 00449_R00_XXXX00_01_EN_2022 11 02 13 17 Stopping a cycle 1 Press Stop to immediately stop the current measurment ...

Page 15: ...plers can be unplug to earn time Pressure Pressure unit Select correct unit in the list Set Fill Pressure instruction Target Min and Max pressure At the end of filling time pressure needs to be between these 2 levels Leak Leak unit Select correct unit in the list Max reject Level to declare part under test as FAIL Std Patm and Temperature Requested parameters when specific unit as sccm is used Off...

Page 16: ...ake Housing TEST Test 2 Cooling Program selected to make Cooling TEST CONFIGURATION MENU Use this menu to configure your E VLT device Parameters Descriptions Date Define correct Date and Time it is important for results stored Job Mode Using this mode the instrument requires to make housing and cooling on a specific battery At the end of the test a special file records the tests Autochain This mod...

Page 17: ...C Rules These limits are designed to provide reasonable protection against harmful interference in a residential installation This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instructions may cause harmful interference to radio communications However there is no guarantee that interference will not occur in a particular insta...

Page 18: ...g 18 7 lbs Electrical power supply 100 240 V AC 55 W 50 60 Hz Overvoltage category II Air supply From 10 to 250 kPa Pneumatic connections Fast connector Staubi RBE 03 Operation temperature 5 C to 45 C 41 F to 113 F Storage temperature 0 C to 60 C 32 F to 140 F Operation altitude Up to 2000 m 6500 ft Relative humidity 80 at 31 C 87 F and 50 at 40 C 104 F Dimensions in millimeters ...

Reviews: