
HANDLEBAR, SEAT, FENDERS AND FUEL TANK
For installation, reverse the removal pro-
cedure.
Order
Job/Part
Q’ty
Remarks
Removing the handlebar
Remove the parts in the order listed.
Refer to “INSTALLING THE REAR
BRAKE MASTER CYLINDER”.
3
Front brake cable
2
4
Parking brake cable
1
5
Choke cable
1
6
Rear brake hose
7
Upper handlebar holder
8
Handlebar
1
1
1
3 - 3
HANDLEBAR, SEAT, FENDERS AND FUEL TANK
CHK
ADJ
HANDLEBAR
5
3
4
6
7
8
(x4)
Refer to “INSTALLING THE PARKING
BRAKE LEVER”.
When installing the handlebar cover,
pass the fuel tank breather hose through
the hole in the handlebar cover.
1
Fuel tank breather hose
1
2
Handlebar cover
1
T
R
.
.
14 Nm (1.4 m
•
kg, 10.1 ft
•
Ib)
T
R
.
.
28 Nm (2.8 m
•
kg, 20.3 ft
•
Ib)
1
2
TIP