
CHECKING THE BALL JOINTS
The following procedure applies to both of the
front arm ball joints.
1. Check:
• ball joint
Damage/pitt
LQJĺ
Replace the front arm.
Free pla
\ĺ
Replace the front arm.
Turns roug
KO\ĺ
Replace the front arm.
INSTALLING THE FRONT ARMS
The following procedure applies to both of the
front arms.
1. Install:
• suspension of arm
Front arm
25 Nm (2.5 m•kg, 18.1 ft•lb)
6 - 42
CHAS
ASSEMBLIES
FRONT ARMS AND FRONT SHOCK ABSORBER