PRODUCT INSPECTION PROCEDURE
Disclaimer:
The information in this document is confidential. It may not be reproduced in whole, or in
part, nor may any of the information contained therein be disclosed without the prior consent of e-con
Systems India Pvt Ltd
Format # : EDSG/F/015
Rev# : 1.1
Below is the step by step process for testing the camera in diagcam application,
9.1 Configure
After the above steps, open Diagcam application to start the testing process,
There shall be a “
xyz.key
” file to configure the application. This configuration file will decide the tests
to be conducted.
To configure the application
•
The users must browse for the file and click on “
Configure
” button.
•
Application configuration is omitted when the user clicks the “
Skip
” button.
Note:
The configuration file shall be provided by e-con along with the Diagcam release package. The
screenshots of Diagcam shown in the document are only for representative purpose and not specific
to See3CAM_130A