Installation & Operation
Manual
E-COMPACT 18 Slim / E-COMPACT 15
Wood Pellet Boiler
woodenergysolutions.co.uk
V.1.0 09/13
Page 1: ...Installation Operation Manual E COMPACT 18 Slim E COMPACT 15 Wood Pellet Boiler woodenergysolutions co uk V 1 0 09 13...
Page 2: ......
Page 3: ...ns for Installation 8 3 3 Operating Area 9 3 4 Connection to the Flue 10 3 5 Operating Problems Caused by Draft Defects in the Flue 11 3 6 Plumbing Connections 12 4 Installation and Assembly 13 4 1 Un...
Page 4: ...destroyed or if it is in poor condition ask for a copy from your retailer or directly from the manufacturer providing product identification data Information which is essential or that requires speci...
Page 5: ...into contact with these parts without adequate protective clothing or suitable implements such as gloves with thermal protection or implements which keep the hands cool Carefully explain this hazard t...
Page 6: ...flammable materials if the ignition system breaks down INFORMATION In case of any problems get in touch with your dealer or a qualified engineer authorised by WES and if a repair is necessary insist o...
Page 7: ...anty The requirements for the flue installation particularly in relation to draught is the responsibility of the system owner Compliance with Local Building Regulations must be adhered to The warranty...
Page 8: ...ral Affairs has powers under the Act to authorise smokeless fuels or exempt appliances for use in smoke control areas in England In Scotland and Wales this power rests with Ministers in the devolved a...
Page 9: ...orific power of 4 4 kW kg with 15 moisture therefore after about 18 months seasoning the equivalent figure for pellets is 4 9 kW kg To ensure good combustion the pellets must be stored in an area that...
Page 10: ...ding the environmental conditions for operation equipped with power supply 230V 50 Hz EN73 23 capable of taking an adequate system for smoke discharge provided with external ventilation if located ind...
Page 11: ...o install the appliance where another heating appliance is installed fireplace stove etc which does not have its own independent air intake Locating the appliance in a room with an explosive atmospher...
Page 12: ...cient flue pipe as directed All sections of the flue must be capable of inspection and removable to enable periodic internal cleaning Position the appliance bearing in mind all the instructions and co...
Page 13: ...e roof of the building and the surrounding landscape is important The E Compact Air Flow Regulation System is equipped to deal with the conditions referenced above by regulating the air flow through t...
Page 14: ...rrent applicable law WES will not be held responsible for damage to persons or things in the event of failed or incorrect operation if the aforementioned warnings are not complied with For connection...
Page 15: ...f delivery The Manufacturer reserves the right to charge for items deemed lost after 48hrs Installation Assembly ECOMPACT Slim Page 13 4 INSTALLATION AND ASSEMBLY Wood Energy Solutions Item Location R...
Page 16: ...st 50mm high and should project a min 300mm beyond the sides and the front of the appliance The plinth must be capable of supporting the weight of the appliance when full with fuel and the plumbing sy...
Page 17: ...ecommended that a power isolation switch is located adjacent to the boiler to isolate the power during servicing and maintenance but also out of the reach of children and to prevent accidental turning...
Page 18: ...CHEMATIC ECOMPACT Slim Page 16 Installation Assembly Wood Energy Solutions Only authorised WES personnel may open the control board Any tampering with the PCB will immediately invalidate the warranty...
Page 19: ...water system The pump is on the return pipework just before the boiler It is recommended that a by pass pipe between the flow and return is used with a valve to regulate the temperature of the water...
Page 20: ...utton on the controller for 3 seconds to activate the pump Repeat the procedure to turn it off Only when the system has been fully vented can the boiler be commissioned The installation and the design...
Page 21: ...Control System ECOMPACT Slim Page 19 5 CONTROL SYSTEM Wood Energy Solutions woodenergysolutions co uk...
Page 22: ...sure high Er10 Real Time Clock error Er11 Ignition Failed Er12 Accidental Extinguishing for low Exhaust Temperature Er13 Error activation Pressure switch Only with the Exhaust fan ON Er14 Lack of volt...
Page 23: ...ld button B for three seconds to clear the error Er13 Accidental Extinguishing for Low Exhaust Temperature Empty any un burnt pellets from the burner pot and hold button B for three seconds Er15 Loss...
Page 24: ...insulated and that a form of heat leak is present electrical connections are complete and safe electrical installation is fully grounded power disconnect is in place and appropriately sized fuses are...
Page 25: ...een filled with fuel the auger will need to be primed This is accessed through the User Menu Load function When this function is activated the slide plate mechanism must open first usually about 30 se...
Page 26: ...e Auger Capacity menu System Menu Outputs Test AugerCapacity This Menu gives the option to run an auger simulation at Power 1 Power 7 We need to check the fuel delivery rate at Power 7 first Set this...
Page 27: ...too high at Power 7 then change the auger value C09 accordingly and repeat the procedure to confirm the correct amount Repeat the procedure for Power 1 and Power 4 Once these settings have been confir...
Page 28: ...ture in the boiler nears its set point the system should start to modulate down through the power levels Once the target temperatue has been reached the system will enter the Extinguishing stage Final...
Page 29: ...mptying the ash containers in the main combustion chamber and the lower ash chamber explain how to remove the burner grate and clear the air holes to ensure good combustion explain the various error c...
Page 30: ...be turned on and off locally at the display on the boiler control panel Hold the ON OFF button for 3 seconds to start the boiler Hold the ON OFF button for 3 seconds to turn off the boiler Emptying th...
Page 31: ...the combustion chamber door Unscrew the two fixing knobs on the ash pan Carefully remove the ash pan and dispose of the ash into a metal container ECOMPACT Slim Page 29 Boiler Operation Maintenance W...
Page 32: ...ptied A daily check during the first few days of operation will give an indication as to when it needs to be emptied ECOMPACT Slim Page 30 Boiler Operation Maintenance Wood Energy Solutions woodenergy...
Page 33: ...o enter the hopper This will lead to the malfunction of the auger system and could cause damage to the appliance and invalidate your warranty Always close the lid to the hopper once it has been filled...
Page 34: ...Operating Pressure bar 1 5 Water Flow Connection inch 1 Water Return Connection inch 1 Boiler Drain inch 1 2 Boiler Safety Thermostat Setting C 105 Boiler Class Class Class 5 Boiler Electrical Power...
Page 35: ...Flue Height Determined on Site ECOMPACT Slim Page 33 Boiler Operation Maintenance Wood Energy Solutions woodenergysolutions co uk 1071mm 495mm 1135mm...
Page 36: ...Service Engineer Date Service Provided Service Engineer Date Service Provided Service Engineer Date Service Provided Service Engineer Date Service Provided Service Engineer Date Service Provided Serv...
Page 37: ...Service Engineer Date Service Provided Service Engineer Date Service Provided Service Engineer Date Service Provided Service Engineer Date Service Provided Service Engineer Date Service Provided Serv...
Page 38: ...Solutions Wood Energy Solutions Donaskeigh Tipperary Co Tipperary Ireland Booths Hall Chelford Rd Knutsford England WA16 8GS info woodenergysolutions co uk www woodenergysolutions co uk woodenergysol...