Dynojet Quickshifter Installation Instructions Download Page 2

QEM13 

 

www.powercommander.com

2007-2013 Suzuki GSXR1000  QEM - 2

1  

Remove the main seat and the passenger seat.

2  

Lift the fuel tank up or remove.

3  

Mount the QEM in the tail section using the supplied velcro.  Make sure to 
clean both surfaces with the alcohol swab before attaching.

Route the QEM harness down the left side of the bike.

Unplug the stock wiring harness from the UPPER set of injectors (Fig. B)

Plug the QEM harness in-line of the stock wiring harness and UPPER injectors 
(Fig. C).

Reinstall fuel tank.

Plug the wiring harness from the shift sensor switch into the matching 
connector of the QEM. 

 

If using an older shift sensor that does not have this matching connector, the 
wires will need to be spliced.

FIG.A

FIG.C

FIG.B

Reviews: