3.1.5 Engineering coordination
Attention should be paid to the following items before construction
:
Power line specification.
The power line specification shall meet the requirements of maximum
discharge current for each product
.
Mounting space and bearing capacity.
Make sure that the battery has enough room to install, and that the battery
rack and bracket have enough load capacity
.
Wiring.
Make sure the power line and ground wire are reasonable. Not easy to short-
circuit, water and corrosion
.
3.2 Equipment installation
Table 3-2 Installation steps
Step 1
Mechanical
installation
1.Battery placement position determination
2.Battery module installation
Communication
Bottom module
to BDU CAN2
IN
Black
/L2200mm
/Double
RJ45 plug
1
Ground wire
L3000mm,4mm
²
1
User Manual
PowerRack HV4
User manual
1
Screw
Combination
screws
M6*14
60
CAN resistor
120
Ω
1