8.4 Running-in instructions
8.4.1 General
The following maintenance work must be performed when running
in new machines or overhauled engines.
8.4.2 After 25 operating hours
1.
Change the engine oil.
2.
Check the valve clearance, adjust if necessary
8.8.2 „Checking, adjusting the valve clearance“ on page 76
3.
Check engine and machine for leaks.
4.
Retighten the fastening screws on air filter, exhaust and other
attachments.
5.
Retighten the bolted connections on the machine.
6.
Check the V-belt
Chapter 8.10.4 „Servicing the V-
.
7.
Check the oil level in the exciter shaft housing
8.10.5 „Checking the oil level in the exciter
.
Maintenance – Running-in instructions
DRP20
70
Summary of Contents for DRP20
Page 2: ...2...
Page 6: ...Table of contents DRP20 6...
Page 7: ...1 Introduction Introduction DRP20 7...
Page 11: ...2 Technical data Technical data DRP20 11...
Page 15: ...3 Concerning your safety Concerning your safety DRP20 15...
Page 39: ...4 Indicators and control elements Indicators and control elements DRP20 39...
Page 42: ...Indicators and control elements Engine DRP20 42...
Page 43: ...5 Checks prior to start up Checks prior to start up DRP20 43...
Page 49: ...6 Operation Operation DRP20 49...
Page 59: ...7 Loading transporting the machine Loading transporting the machine DRP20 59...
Page 64: ...Loading transporting the machine Transport wheels DRP20 64...
Page 65: ...8 Maintenance Maintenance DRP20 65...
Page 99: ...9 Troubleshooting Troubleshooting DRP20 99...
Page 106: ...Troubleshooting What to do if the engine has flooded DRP20 106...
Page 107: ...10 Disposal Disposal DRP20 107...
Page 109: ...11 List of special tools List of special tools DRP20 109...
Page 111: ......
Page 112: ......