TABLE 5.1
MEASURING HEAD RESISTANCE CHART (CONTINUED)
Measure Between
Leads:
Approx.
Value (
Ω
)
LKP-180
Approx.
Value (
Ω
)
LK-300
Approx.
Value (
Ω
)
LKP-400
Circuit
Cable to “B1” Quarter
of Head
70 & 79
20-24
15-18
11-15
Coil Circuit - Channel #9 B1
71 & 80
10-12
7.5-9
5.5-7.5
Coil Circuit - Channel #10
72 & 81
10-12
7.5-9
5.5-7.5
Coil Circuit - Channel #11
73 & 82
10-12
7.5-9
5.5-7.5
Coil Circuit - Channel #12
74 & 83
20-24
15-18
11-15
Coil Circuit - Channel #13 B1
65 & 67
750-1000
750-1000
750-1000
Hall Current - Channel #9 - 12
57 & 58
240-550
240-550
240-550
Hall Signal - Channel #9
59 & 60
240-550
240-550
240-550
Hall Signal - Channel #10
61 & 62
240-550
240-550
240-550
Hall Signal - Channel #11
63 & 64
240-550
240-550
240-550
Hall Signal - Channel #12
CABLE TO "B2" Quarter
of Head
95 & 86
20-24
15-18
11-15
Coil Circuit - Channel #13 B2
96 & 87
10-12
7.5-9
5.5-7.5
Coil Circuit - Channel #14
97 & 88
10-12
7.5-9
5.5-7.5
Coil Circuit - Channel #15
98 & 89
10-12
7.5-9
5.5-7.5
Coil Circuit - Channel #16
99 & 90
20-24
15-18
11-15
Coil Circuit - Channel #1 B2
101 & 103
750-1000
750-1000
750-1000
Hall Current - Channel #13 -16
105 & 106
240-550
240-550
240-550
Hall Signal - Channel #13
107 & 108
240-550
240-550
240-550
Hall Signal - Channel #14
109 & 110
240-550
240-550
240-550
Hall Signal - Channel #15
111 & 112
240-550
240-550
240-550
Hall Signal - Channel #16
5.7 METERING UNIT INSTALLATION
The location of the Metering Unit should be determined by the following factors:
1.
An indoor location or protected where the ambient air temperature is within -20°C to
+55°C at all times should be used.
2.
The location should be protected from rainfall or snow.
3.
The location should be within reach of the head cable length to be routed (33 feet or
10 meters).