Atomix LT Installation Guide
3.1.4 Setting up the Remaining Internal Connections
To finish the cabling inside the computer system you may want to con-
nect a rechargeable battery (accu) to the fail safe connector. In the
event of a power loss it will provide a bypass of the SDI input signals to
the SDI outputs. The rechargeable battery can be internally connected
to either the Fail Safe 1 connector as shown in the following figure or
externally to Fail Safe 0 (see section “Overview of the Component
Side” on page 2-4). For further details about the accu see section
“Technical Data” on page A-1.
Figure 3-7: Remaining internal connections
When the internal connections are all set up, Atomix LT is properly con-
nected to your computer system. As a last step you must now finish the
installation.
Summary of Contents for Atomix LT
Page 1: ...Atomix LT Installation Guide Version 2 0 PCI Video Board Atomix LT Installation Guide...
Page 2: ......
Page 6: ......
Page 8: ......
Page 34: ...2 16 Atomix LT Installation Guide...
Page 52: ...3 18 Atomix LT Installation Guide...
Page 68: ...A 14 Atomix LT Installation Guide Atomix LT 4 BNC...