Turn idle control off
The idle control is located on the top center of the main
power panel. Turn the switch OFF to prevent the unit trying
to idle down before the engine is warmed up.
8.
Connect propane tank
The propane hose is located on the left side of the regulator,
below the OHV valve cover. Screw the open ACME nut
connection to your propane tank and turn the tank on.
6.
13
Turn breaker on / connect
The breaker is located on the right side of the front power
panel. Flip the breaker up to allow power to flow to the
receptacles. Connect your devices to the receptacles on
the front panel. Start with the largest loads first.
10.
Turn battery switch on
The battery switch is located on the top center of the main
power panel. Turn the switch ON to allow power to the
push button start.
7.
Start generator
The push button start left side of the main power panel.
Press the button for 1 second and release to start the
generator.
9.
Summary of Contents for DUAL FUEL HYBRID ELITE DS13000EH
Page 2: ......
Page 5: ......
Page 18: ......
Page 43: ...MAINTENANCE LOG Date Generator Hours Maintenance Performed 43 ...
Page 63: ...63 ...
Page 69: ......
Page 70: ...5800 Ontario Mills Parkway Ontario CA 91764 United States 844 DuroMax ...