49
Date
Generator Hours
Maintenance Performed
Maintenance Log
As a best practice it’s recommended to keep a log of the generator hours and maintenance to
ensure your generator is always operating to its full potential.
Break-In Period
As the best practice for any new combustion motor it’s recommended to perform the break
in procedure as follows:
●
Run the generator for the first 6-8 hours on conventional oil, then change the oil. After
the break-in period synthetic oil may be used.
●
During the break in period of the first 6-8 hours keep the generator load under 50%
for optimal results.
●
Check and clean the air filter if necessary after the break-in period.