Safety
Service Instructions 2112-5 - 00.0 - 02/2020
7
2 Safety
This chapter contains basic information for your safety. Read the instruc-
tions carefully before setting up or operating the machine. Failure to do so
can result in serious injury and property damage.
2.1 Basic safety instructions
The machine may only be used as described in these instructions.
These instructions must be available at the machine's location at all times.
Work on live components and equipment is prohibited. Exceptions are
defined in the DIN VDE 0105.
For the following work, switch off the machine at the main switch or
disconnect the power plug:
• Replacing the needle or other sewing tools
• Leaving the workstation
• Performing maintenance work and repairs
• Threading
Missing or faulty parts could impair safety and damage the machine.
Only use original parts from the manufacturer.
Transport
Use a lifting carriage or stacker to transport the machine. Raise the machine
max. 20 mm and secure it to prevent it from slipping off.
Setup
The connecting cable must have a power plug approved in the relevant
country. The power plug may only be assembled to the power cable by
qualified specialists.
Obligations
of the operator
Follow the country-specific safety and accident prevention regulations
and the legal regulations concerning industrial safety and the protection
of the environment.
All the warnings and safety signs on the machine must always be in legible
condition. Do not remove!
Missing or damaged warnings and safety signs must be replaced
immediately.
Requirements
to be met by
the personnel
Only qualified specialists may be used for:
• Setting up the machine/putting the machine into operation
• Performing maintenance work and repairs
• Performing work on electrical equipment
Only authorized persons may work on the machine and must first have
understood these instructions.
Summary of Contents for beisler 2112-5
Page 1: ...Service Instructions...
Page 8: ...About these instructions 6 Service Instructions 2112 5 00 0 02 2020...
Page 40: ...Setting up the machine 38 Service Instructions 2112 5 00 0 02 2020...
Page 76: ...Programming 74 Service Instructions 2112 5 00 0 02 2020...
Page 84: ...Maintenance 82 Service Instructions 2112 5 00 0 02 2020...
Page 86: ...Decommissioning 84 Service Instructions 2112 5 00 0 02 2020...
Page 88: ...Disposal 86 Service Instructions 2112 5 00 0 02 2020...
Page 96: ...Technical data 94 Service Instructions 2112 5 00 0 02 2020...
Page 103: ......