
Sewing unit
83
Service Instructions 911-211 - 02.0 - 10/2016
5
Sewing unit
5.1
Checking the machine zero point
The machine zero point is factory-set to the correct value.
Fig. 67: Checking the machine zero point
Gage required: Clamp with test bore.
To check the machine zero point:
1.
Tap on
Extras
>
Service
>
Multitest
.
2.
Tap on
Transportklammer (Feed clamp)
.
3.
Assemble the clamp (1).
4.
Tap on
Referenzieren (Move to reference position)
.
The machine moves to the reference position.
5.
Tap on
Mittelpunkt (Center point)
.
The machine moves to the center position. The needle is positioned
within the center point bore (2), and the tip of the needle can be low-
ered into the bore by turning the arm shaft crank.
6.
Tap on
Test
.
The machine moves to the test position. The center of the needle is
positioned within the test bore (3), and the tip of the needle can be
lowered into the bore by turning the arm shaft crank.
(1)
- Clamp with test bores
(2)
- Center point bore
(3)
- Test bore
③
①
②
Summary of Contents for 911-211
Page 1: ...Service Instructions 911 211...
Page 6: ...Table of Contents 5 Service Instructions 911 211 02 0 10 2016...
Page 10: ...About these instructions 9 Service Instructions 911 211 02 0 10 2016...
Page 90: ...Sewing unit 89 Service Instructions 911 211 02 0 10 2016...
Page 146: ...Creating programs with DA CAD 5000 145 Service Instructions 911 211 02 0 10 2016...
Page 158: ...Decommissioning 157 Service Instructions 911 211 02 0 10 2016...
Page 160: ...Disposal 159 Service Instructions 911 211 02 0 10 2016...
Page 170: ...Technical data 169 Service Instructions 911 211 02 0 10 2016...
Page 195: ...Appendix Service Instructions 911 211 02 0 10 2016 194...
Page 197: ...Appendix Service Instructions 911 211 02 0 10 2016 196 13 3 Pneumatic diagram...
Page 199: ......