Operation
Operating Instructions 610-10/630-10 - 01.0 - 01/2021
21
Switching on the power supply
To switch on the machine:
1. Press the main switch (1) down to position I.
POWER LED illuminates, MESSAGE LED flashes briefly.
The splash screen appears on the display:
• On the left, the class
• On the right, the firmware
You can hear the air being released onto the moving parts.
The machine performs a reference run and is ready for
sewing when the display shows the start screen.
The controller starts in the operating mode that was active
when it was switched off -
MAN
or
AUTO
.
Switching off the power supply
To switch off the machine:
1. Press the main switch (1) up to position 0.
The control panel shuts down. When the POWER LED goes
out, the machine and the controller are disconnected from
the power supply.
4.3
Changing the needle
Order
After switching to needles with a thickness of 100 or greater, have
the needle evasive movement of the looper (ellipsis width) adjust-
ed by qualified specialists. For the proper setting, refer to the
Service Instructions.
Summary of Contents for 610-10
Page 1: ...610 10 630 10 Operating Instructions...
Page 6: ...Table of Contents 4 Operating Instructions 610 10 630 10 01 0 01 2021...
Page 16: ...Safety 14 Operating Instructions 610 10 630 10 01 0 01 2021...
Page 44: ...Operation Operating Instructions 610 10 630 10 01 0 01 2021 42...
Page 84: ...Settings via software Operating Instructions 610 10 630 10 01 0 01 2021 82...
Page 96: ...Maintenance Operating Instructions 610 10 630 10 01 0 01 2021 94...
Page 112: ...Decommissioning 110 Operating Instructions 610 10 630 10 01 0 01 2021...
Page 116: ...Disposal 114 Operating Instructions 610 10 630 10 01 0 01 2021...
Page 136: ...Troubleshooting Operating Instructions 610 10 630 10 01 0 01 2021 134...
Page 147: ......