Example for double-walled flues
With double-walled or multiple-walled flues also an initial opening is made in the outer
wall. If the installation is on the inner wall the opening in the outer wall should be
somewhat larger. An appropriate opening is then made in the inner wall. The proce
dure depends on the materials as in the examples in the preceding section. The an
chor plate, welding or the gusset plate for the welded-in pipes with adjustment flanges
should ideally be installed on the inner wall, so as to retain the gases within the duct.
Seal the installation opening in the outer wall, leaving clearance to allow movement of
the flanged tube due to thermal expansion. Any additional mounting of the flanged
tube on the outer wall must also allow this movement.
Please observe the maximum length of the welded-in pipe (see
) and the
tube cross sections associated with it, which is limited due to the measurement beam.
For tube lengths 600 mm and greater, the pitch circle diameter and flange diameter
are different, and so is the system to be used. Comply also with the instructions and
specifications as for the standard installation (
5.4.1 Standard installation of the wel
ded-in pipes with adjustment flanges [
1 Duct wall
2 Gusset plate
3 Welded-in pipe
4 Red dot at the top of the flange
5 Attaching the gusset plate to stack
wall
6 Flexible seal
7 Temporary displacement of the wel
ded-in pipe
Fig. 5.8: Installation of a welded-in pipe with adjustment flange in a double-walled flue
Summary of Contents for D-R 290
Page 12: ...12 D R 290 ...
Page 18: ...1 General 18 D R 290 ...
Page 20: ...20 D R 290 ...
Page 28: ...2 Safety 28 D R 290 ...
Page 30: ...30 D R 290 ...
Page 38: ...3 Delivery 38 D R 290 ...
Page 40: ...40 D R 290 ...
Page 60: ...4 Product description 60 D R 290 ...
Page 106: ...106 D R 290 ...
Page 152: ...152 D R 290 ...
Page 174: ...8 Maintenance 174 D R 290 ...
Page 176: ...176 D R 290 ...
Page 178: ...9 Appendix 178 D R 290 Fig 9 2 Measurement point questionnaire 2 ...
Page 194: ...9 Appendix 194 D R 290 ...
Page 200: ...11 Index 200 D R 290 ...
Page 202: ...GmbH Kollaustraße 105 22453 Hamburg Germany www durag com ...