![Dura Trel 11102 Assembly Instructions Download Page 1](http://html1.mh-extra.com/html/dura-trel/11102/11102_assembly-instructions_2540415001.webp)
Dura-Trel, Inc. ~
PO Box 122, Sheboygan Falls, WI 53085 ~ Toll Free 877-258-6020
#11102
L
ARGE
F
AN
T
RELLIS
ASSEMBLY INSTRUCTION
SSEMBLY INSTRUCTIONS
S
TOOLS required
Tape Measure or Ruler
Super or Crazy Glue
Phillips Screwdriver
Flathead Screwdriver
or
Drill with #2 Phillips and Flathead Bits
9mm, 11/32” or adjustable wrench
TRELLIS ASSEMBLY
TRELLIS ASSEMBLY
(Refer to Drawing)
(Refer to Drawing)
On a clean flat surface lay the 72” tubes side by side with the holes lined up. Insert the two
#8 3½” bolts through all five tubes with a washer placed in between the bolt and the tubes. Place
a second washer over the opposite end of the bolt and fasten the locking nut snug up against the
tubes.
On a clean flat surface lay the 72” tubes side by side with the holes lined up. Insert the two
#8 3½” bolts through all five tubes with a washer placed in between the bolt and the tubes. Place
a second washer over the opposite end of the bolt and fasten the locking nut snug up against the
tubes.
Take the 7/8 x 1 ½ x 25” bottom cross rail; (with the pilot holes facing up and holes closest
together toward fan base); insert the tubes into routed holes and slide the cross rail down until the
bottom of the cross rail is 32" above the bottom of the trellis. Fasten the cross rail into place with
screws and snap screw caps over screw heads.
Take the 7/8 x 1 ½ x 25” bottom cross rail; (with the pilot holes facing up and holes closest
together toward fan base); insert the tubes into routed holes and slide the cross rail down until the
bottom of the cross rail is 32" above the bottom of the trellis. Fasten the cross rail into place with
screws and snap screw caps over screw heads.
Next slide the 7/8 x 1 ½ x 54” top cross rail; (with pilot holes facing up and the holes closest
together toward fan base); over the tubes. Slide the top cross rail down until the distance between
the bottom cross rail and the top cross rail measures 24”. Fasten with screws and snap screw caps
over screw heads.
Next slide the 7/8 x 1 ½ x 54” top cross rail; (with pilot holes facing up and the holes closest
together toward fan base); over the tubes. Slide the top cross rail down until the distance between
the bottom cross rail and the top cross rail measures 24”. Fasten with screws and snap screw caps
over screw heads.
Snap the 5/8” round end caps onto the tube tops (you may need to warm them slightly in your
hand or in warm water to make them easier to apply). Slide the 7/8 x 1 ½ molded end caps onto
the ends of the cross rails. Household glue may be used if molded end caps are slightly loose.
Snap the 5/8” round end caps onto the tube tops (you may need to warm them slightly in your
hand or in warm water to make them easier to apply). Slide the 7/8 x 1 ½ molded end caps onto
the ends of the cross rails. Household glue may be used if molded end caps are slightly loose.
To install push the trellis 12” into the ground. If soil is extremely hard, loosen soil or soak with
water before installing trellis.
To install push the trellis 12” into the ground. If soil is extremely hard, loosen soil or soak with
water before installing trellis.
If you encounter missing or defective parts, please contact manufacturer direct at
If you encounter missing or defective parts, please contact manufacturer direct at
toll free # below.
toll free # below.