![Dunkirk EXCELSIOR Series Instructions Download Page 1](http://html1.mh-extra.com/html/dunkirk/excelsior-series/excelsior-series_instructions_2539837001.webp)
Remove all components from crate. It may be to the
1.
installer’s advantage to place the cast iron boiler block
close to where the final installation location will be.
Install rubber grommets in rear top plate. Attach top
2.
and bottom plates to boiler with brass bolts and wash-
ers.
Be sure top flanges point toward the front of the
boiler
or the top panel will not fit on the boiler. See
Figure 1
.
Figure 1
P/N 240007210, Rev. A [04/08]
KNOCKDOWN ASSEMBLY
Instructions for
Excelsior oil Fired Boiler
SUPPLEMENT
AL INSTRUCTIONS
This assembly must be completed by a qualified installer or service agency, in accordance with the
manufacturer’s instructions, and in accordance with all codes and requirements of the authority having
jurisdiction. Failure to follow these instructions could result in fire or explosion resulting in property dam
-
age, personal injury, or loss of life.
WARNING
!
Wrap insulation around boiler with the backing side
3.
out. Wrap 2 banding strips around insulation. Cinch
banding together with plastic buckles provided. See
Figure 2
. Cut off excess banding material.
Figure 2
Insulation straps with buckles
Attach pipe nipples to supply and return outlets. Be
4.
sure to use pipe dope before screwing into boiler.
1