26
Maintenance & Care (Continued)
Maintenance Schedule (Continued)
5 Bottom Flaps (Fig 21)
The required seed rate is controlled by both the metering
wheels and the bottom flaps. The seed flows from the seed
box into the metering wheel housings. Inside the metering
wheel housing (1) the seed is caught between the metering
wheel (2) and the bottom flap (3). The metered amount of
seed is transported by the metering wheel to the edge of
the bottom flap where it drops off into the seed guide tube
which leads to the coulter. Varying grain sizes require the
matching of the flap clearance to the different grain sizes.
This matching is done by raising or lowering the bottom
flaps by using the flap adjusting lever on the LH end of the
seed box. If larger foreign particles, e.g. stones get
between the metering wheel and the bottom flap, the
bottom flap can give way downwards. A strong return
spring (4) brings the bottom flap immediately back into the
working position.
The metering system should be checked every 1/2 year
or before any sowing period with an empty seed box
and empty metering housings.
Use the following procedure:
Put the bottom flap setting levers (1) (located on the LH
end of the seed boxes) in position “1” for the front box and
position “1” for the rear box. Refer Fig 22.
By turning the metering wheel shaft by hand check the
flaps are all set to a gap of 0.1 to 0.5mm (refer Fig 21).
To adjust individual flaps use the spring tensioning screw
(5) (Fig 21).
Storage
Preparing the Machine for Storage.
Locate on a dry level surface. The machine should be stored
wherever possible with the rams retracted (where fitted). The
drive chains should be lubricated with suitable roller chain
lubricant before prolonged periods of storage.
For longer term storage remove seed/fertiliser tubes from the
coulters and allow to hang without deformation. Check tube
lengths when replacing.
It is recommended that maintenance be carried out at the end
of the season, giving sufficient time to obtain spare parts
and/or carry out repairs if required.
Fig 21
Fig 22
1
Import
ant !
1
3
4
5
2
Summary of Contents for DO 07185
Page 2: ......
Page 24: ...22 Linkage Renovator Calibration Notes ...
Page 26: ...24 Linkage Renovator Lubrication Notes ...
Page 29: ...27 Linkage Renovator Maintenance Notes Pt No 67376 Issue 0207 ...
Page 30: ...28 Linkage Renovator Maintenance Notes ...
Page 36: ...34 Linkage Renovator Mainframe 1 1 10 12 9 8 17 7 4 18 2 5 13 14 15 16 4 16 15 3 ...
Page 42: ...40 Linkage Renovator Tine and Boot Assembly 7 8 6 2 4 13 14 5 3 12 14 10 11 9 1 ...
Page 46: ...44 Linkage Renovator Shafts Chain Tensioners Pedestal 1 3 4 5 5 2 2 2 1 Single Box Dual Box ...
Page 60: ...58 1 1 2 3 3 4 4 5 6 6 7 7 8 8 9 9 10 10 11 12 13 Linkage Renovator Seeder Mechanism ...