[EN] English - K0463 Revision A
Quick Reference
WARNING: Before using this instrument, read and understand the ATEX requirements
and conditions and the “Safety” section. It is dangerous to ignore the specified
warnings.
S1 PV
621-IS models: Start operations
S1.1
Release the pressure/Attach the device under test
S1.2
Vacuum OR pressure operation
A2.1 (Front cover)
1
Step
Procedure
1.
Release the pressure.
2.
Use the applicable adaptor to
attach the device; figure A3.
4
2
2
3
+
-
1
4
5
Step
Procedure (Vacuum)
1.
Set to vacuum operation (-).
2.
Turn the volume adjuster to
mid-range
or fully-clockwise.
3.
Seal the system.
4.
Set the vacuum with the pump.
5.
Adjust the vacuum
(+ decrease; - increase).
11
8
4
12
8
2
Step
Procedure (Pressure)
1.
Set to pressure operation (+).
2.
Turn the volume adjuster to
mid-range.
3.
Seal the system.
4.
Set the pressure with the pump.
5.
Adjust the pressure
(+ increase; - decrease).
11
8
4
12
8
Summary of Contents for PV 62X-IS
Page 2: ......
Page 6: ...Copyright 2009 Baker Hughes Company iv PV 62X IS Quick Start Guide English ...
Page 18: ...12 Specification K0463 Revision A EN English ...
Page 68: ...62 Specifiche K0463 Revisione A IT Italiano ...
Page 82: ...76 Especificações K0463 Revisão A PT Português ...
Page 96: ...90 Технические характеристики K0463 Редакция A RU Русский ...
Page 109: ......