![Dru Maestro 60/2 Tall RCH Installation Manual Download Page 59](http://html1.mh-extra.com/html/dru/maestro-60-2-tall-rch/maestro-60-2-tall-rch_installation-manual_2533009059.webp)
If the main burner DOES continue to burn:
11. Clean the glass pane after taking into operation for the first time, as described in the user manual. Then mount the
glass pane as described in section 8.
12. Repeat the ignition procedure a few times and perform checks as described in section 10.3.2.
13. The main burner should ignite smoothly at each attempt and should continue to burn.
14. Clean the glass pane after burning for the first time, as described in the user manual.
3
Wait 5 minutes before you re-ignite the appliance.
When stoking up for the first time, set the appliance at full position. When the appliance is stoked up, the flame picture
can be affected and an unpleasant smell may occur as volatile components evaporate. This process may take a number of
hours. Properly aerate the room and remove pets from the room (see section 3 of the User Manual).
10.3.2 Igniting the burner(s)
3
- The ignition mechanism should ignite the main burner(s) within a few seconds and without popping.
- The main burner(s) must ignite smoothly, without popping and across the entire burner, and continue to burn.
- The second burner (if applicable) should ignite smoothly across the entire length of the burner(s) and continue to burn.
- If the appliance does not ignite after three failed attempts, it will enter into a hard lock-out for 30 minutes in order to
avoid a dangerous accumulation of gas. Make sure there is no more gas present in the appliance, before a new ignition
attempt is made. Ignite the appliance in the same way as the first ignition as described in section 10.3.1.
1
Check the correct ignition of the main burner from cold condition.
2
If sparks are observed between the electrodes of the ignition mechanism, the main burner should ignite within a few
seconds.
3
If NO sparks are determined, it is NOT permitted to continue the procedure. Consult the diagram with error messages
(appendix 1: Malfunctions).
10.4 Flame picture
When stoking up for the first time, the flame picture is affected by the evaporation of, for instance, volatile components
from paint and other materials. In case of a cold start, the appliance should first reach the correct temperature before the
flame picture can be assessed.
2
The flame picture and a good flame transfer can only be assessed when the glass pane is mounted and/or closed.
1
Check that the flame picture is in order.
1
Consult the diagram with error messages (appendix 1: Malfunctions) if the flame picture is not correct.
I nst allation manual
5 9
Summary of Contents for Maestro 60/2 Tall RCH
Page 15: ...Installation manual 15 A D B C 38C 2500 7 4...
Page 17: ...Installation manual 17 1 3 4 2 38C 2504 tooltip tooltip 7 6...
Page 19: ...Installation manual 19 38C 2793 1 2 3 4 5 6 7 7...
Page 21: ...Installation manual 21 1 3 2 4 38C 2619 586 5mm 1 2 38C 2503 7 8 7 9...
Page 23: ...Installation manual 23 5 7 8 6 38C 2507 1 60 1 3 2 4 2 mm 38C 2506 1 7 10 7 11...
Page 24: ...Installation manual 24...
Page 29: ...Installation manual 29...
Page 32: ...Installation manual 32...
Page 37: ...Installation manual 37 1 2 3 4 5 6 7 8 9 12 11 10 38C 2511 2 7 15...
Page 47: ...Installation manual 47 38P 0820 2 8 16...
Page 48: ...Installation manual 48 38P 0815 2 Eco Glow 38P 0814 2 Eco Glow 8 17 8 18...
Page 49: ...Installation manual 49 A C 38P 0816 2 B 8 19...
Page 50: ...Installation manual 50 D E 38P 0817 2 1 cm 8 20...
Page 51: ...Installation manual 51 38P 0819 0 Eco Glow F 38P 0818 0 G Eco Glow 8 21 8 22...
Page 52: ...Installation manual 52...
Page 57: ...Installation manual 57...
Page 64: ...Installation manual 64...
Page 65: ...Installation manual 65...
Page 66: ...Installation manual 66...
Page 67: ...Installation manual 67...