Droll Yankees B-7 Quick Start Manual Download Page 1

05/02/17 
L: instructions/all updated instructions/PDF/ 

 

 

B-7 Sunflower Domed Cage Feeder (B7DC) 

 

Droll Yankees feeders can be disassembled for easy cleaning and part replacement. 

 

Cleaning:  

 

Please, for the sake of the birds, keep your feeders clean!

  Dirty feeders can harm the birds.  Use a mild soap & water solution and a 

soft brush for thorough, simple cleaning.  Dry completely before filling with seed. 

 

Note:  Two B-7 Washers were added in December of 2016 to discourage squirrels from lifting the top cap and damaging the tube.  These 
washers are available for installation on existing feeders.   Please contact Droll Yankees if you are currently experiencing this problem. 

 

Installation of B-7 Washers on Existing Feeders 

 

 

 

 

1.

 

Remove the bail wire by cutting the 90

 bend on each end of the bail wire with wire cutters, or straightening with pliers.  Pull the 

bail wire out from the bail rod and the top cap.  The top cap and the bail rod should remain in place on the feeder for installation 
of the bail wire with the B-7 washers. 

2.

 

Place both B-7 washers, with the imprint of the bird facing one another, on one end of the bail wire and slide the B-7 washers up 
the bail wire a few inches, holding them in place. 

3.

 

Insert the ends of the bail wire through both holes in the top cap and then the bail rod.  Use pliers to bend the ends of the bail 
wire to a 90

 angle.   

4.

 

Slide one of the B-7 washers over to the opposite side of the bail wire.  Both B-7 washers should rest on the top of the cap at a 

slight angle with the bird, which is imprinted on each B-7 washer, visible. 

Important:    Slide  both  B-7  washers  upward  to  the  center  of  the  bail  wire  before  lifting  the  top  cap  for  filling  or  when 
lowering the bail wire. 

 

 

Disassemble 

 

 

 

1.

 

Remove the cage from the base of the feeder by unscrewing the black threaded wing nut located on the bottom of the cage. 

2.

 

Remove the top cap by cutting the 90

 bend on each end of the bail wire with wire cutters, or straightening with pliers.  Lift the 

top cap, along with the bail wire with the B-7 washers, from both holes in the bail rod.  Remove the bail rod from the tube.  

3.

 

Note:  The diameter of the spring clip can be enlarged by squeezing the ends of the spring clip together for removal and 
assembly of the upper cage components. 

Slide the spring clamp and then the universal cover up the tube and remove. 

4.

 

With the feeder in a horizontal position, push the feeder down against a perch rod on a flat surface until the perch rod has been 
pushed further through the opposite side of the tube, and remove.  Disassemble each pair of ports which are held together with 
a nut and a Phillips screw, keeping the Phillips screw in place on the port for reassembly.  

5.

 

Remove the base by unscrewing the two Phillips screws located underneath the base.  Push the baffle upward  approximately  
1”- 1½” for removal of the hanger bar.   

6.

 

Lay the tube on its side on a flat surface, positioning the hanger bar horizontal with that surface.  Using the palm of your hand, 
apply  enough  pressure  on  the  tube,  at  the  hanger  bar,  to  slightly  widen  the  tube  and  reach  inside  the  tube  and  remove  the 
hanger bar.  Push the baffle further into the tube if the hanger bar is difficult to remove.  The baffle can now be removed using 
the lower two 1” port holes in the tube to push the baffle out from the tube.                 

 

 

 

 

Assemble Feeder and Upper Cage Components 

 

 

1.

 

Place the baffle inside the bottom of the tube with the open end facing down, aligning the square slots to go over the upper holes 
for the hanger bar, and the round slots  to go over the  lower holes for the  perch rod.  Push the baffle upward approximately       
1”- 1 ½” for installation of the hanger bar.    

2.

 

Lay the tube on its side on a flat surface. Using the palm of your hand apply enough pressure on the tube, horizontal to the holes 
for the hanger bar, to slightly widen the tube, and install the hanger bar.  Push the baffle further into the tube if the hanger bar is 
difficult to install.  Move the baffle into place using the lower 1” port holes in the tube.   

Important:  The baffle is positioned correctly if the top of the baffle slopes to both of the ports, and the bottom of the baffle 
is resting on the base, once the base is installed in step 5.  

                                                                                                                                                                                                     

                            

 

3.

 

Port Assembly:

  

While the tube is in a horizontal position, hold a nut in place on a port without a Phillips screw with your finger, 

while placing the port onto the tube.  The nut must be held in place on the port until secured by the Phillips screw. Take a port 

with  the  Phillips  screw,  and  place  opposite  of  the  port  with  the  nut,  aligning  the  Phillips  screw  with  the  screw  hole  on  the 
opposite port.  Tighten the Phillips screw until you feel resistance, then back the screw out ¼ turn.  Make certain that the hole in 
the bottom of the port is aligned with the perch rod hole in the tube. 

Note:   The Phillips screws for the base and the ports are the same size.

 

4.

 

Perch Rod Installation - 

Note:  For easier insertion, place the perch rods in the freezer for 20-30 minutes. 

a.

 

Hold a perch rod in an upright position on a flat surface.  With the feeder in a horizontal position, line up the perch rod 
with the perch rod hole in the port.  Push the feeder down onto the perch rod until the perch rod makes contact with the 
opposite side of the tube. 

Reviews: