background image

Rapid-sorb

®

  Dispersion Tube System

DRISTEEM HUMIDIFIER DISPERSION

DRI-STEEM Corporation 

a subsidiary of Research Products Corporation 

DriSteem U.S. operations are ISO 9001:2015 certified
www.dristeem.com
U.S. Headquarters:

14949 Technology Drive

Eden Prairie, MN 55344

800-328-4447 or 952-949-2415

952-229-3200 (fax)

Continuous product improvement is a policy of DriSteem; therefore, product features and 

specifications are subject to change without notice.
DriSteem and Rapid-sorb are registered trademarks of Research Products Corporation and are 

filed for trademark registration in Canada and the European community.
Product and corporate names used in this document may be trademarks or registered 

trademarks. They are used for explanation only without intent to infringe.
© 2015 Research Products Corporation
Form No. Rapid-sorb-IOM-EN-0515

Part No. 890000-621 REV A

Before you begin installation, read all dispersion instructions.

•  Unpack shipment and verify receipt of all Rapid-sorb

®

 components with 

packing list. Report any shortages to the DriSteem factory immediately.

•  When choosing a location for installation, select one that provides 

necessary access in and around ductwork or air handler.

•  Rapid-sorb assemblies are typically installed centered side to side in duct, 

or across face of coil in air handler.

•  The center line of the outer dispersion tubes should never be closer than 

4.5" (114 mm) from side of ductwork or air handler wall.

•  Rapid-sorb tubes are provided with an L-bracket for installation:

 - NOTE: Before marking and drilling holes in duct or air handler, 

refer to ALL pitch requirements for the Rapid-sorb assembly in 

the instructions. Size, quantity, and location of penetrations are 

determined by specific dimensions and configuration of Rapid-sorb 

assembly you received.

NOTE: Hardware for mounting L-bracket to duct or air handler wall and 
hardware for header support bracket is not provided. Use a fastener 
of sufficient length on the L-bracket to accommodate 1/8"/ft (1%) pitch 
requirements toward the 3/4" pipe thread (DN20) header drain fitting.

•  Condensate drain connections to the Rapid-sorb header:

 -Piping must be minimum 3/4" I.D. (DN20) and rated for 212°F 

(100°C) minimum continuous operating temperature.

 -Condensate drain line must be piped as shown in the figure. Provide a 

2" (50 mm) drop prior to a 5" (127 mm) water seal.

•  If multiple humidifiers are supplying one Rapid-sorb, a multiple steam supply 

connector is needed:

 -Typically, the multiple steam supply connector attaches to the Rapid-

sorb header supply end with hose cuff and clamps.

 -Route the necessary number of steam supplies from the humidifier tanks 

to the steam supply connector.

 -Position the steam supply connector to accept the steam supplies while 

maintaining the necessary pitch.

 -Make sure the hose clamps on the steam supply connector and header 

are tight.

Table 1-2:
Rapid-sorb header capacities

Header capacity

Header diameter

lbs/hr

kg/hr

inches

DN

≤ 250

≤ 113

2

50

251-500 114-227

3

80

501-800 228-363

4

100

Table 1-1: 
Rapid-sorb tube capacities*

Tube 

diameter

Insulated 

(High-Efficiency 

Tubes)

Uninsulated

inches

DN

lbs/hr kg/hr lbs/hr kg/hr

40

43

19.5

40

18.2

2

50

80

36.4

77

35

*   Capacities shown are for horizontal airflow. 

If active tube length is <22” (559 mm), tube 

quantity per panel may need to increase to 

compensate for reduced capacity of short 

tubes. Consult DriSteem or see DriCalc for 

the correct calculation.

OM-7836a

OM-7837a









Table 4-1:  

Rapid-sorb vertical air flow installations

Tube 

diameter

Without condensate drain*

With condensate drain*

Insulated

Noninsulated

Insulated

Noninsulated

inches

DN

lbs/hr kg/hr lbs/hr kg/hr lbs/hr kg/hr lbs/hr kg/hr

1 ½

40

29

13

28

13

65

30

62

28

2

50

65

30

62

28

97

44

93

42

* Face heights of less than 26" (660 mm) may have reduced tube capacities. 

FIGURE 4-1: VERTICAL AIR FLOW INSTALLATION

Header Outside

Header Inside

Notes:

•    Pitch header towards drain 1/8" per 

foot (1%).

•    Position L-bracket so the flange is 

upstream of dispersion tubes.

•    Use L-bracket as a template to locate 

holes on duct wall.

Reviews: