
11
ULTRA-SORB MP INSTALLATION, OPERATION, AND MAINTENANCE MANUAL
Airflow
DC-1081_2020AA
FIGURE 11-1: PLACING A DISPERSION ASSEMBLY IN A DUCT
C
AIRFLOW PROVING SWITCH
Ensure placement is representative of air to dispersion device. Sail switch
recommended for variable air volume applications. Pressure switch
recommended for constant volume applications.
DUCT HIGH LIMIT
Place high limit as far downstream as possible but before a duct transition to
prevent wetting again duct walls or other components within the airstream.
General recommendation is 8'-12' (2.4 to 3.7 m) downstream.
PLACEMENT IN A DUCT
Location C is the best choice. Air leaving a fan is usually very turbulent and
can cause vapor to not absorb at the expected non-wetting distance. Allow for
more distance if installing downstream from a fan.
Calculated absorption distances assume even airflow across entire dispersion
device.
INSTALLATION
Horizontal duct
Duct
high limit
humidity
control
Airflow
proving
switch