Operation – and Assembly Instruction
SF
6
-insulated Switchgear
Type MINEX-E 12-36kV
State 05-2017
DRIESCHER
WEGBERG
Page 1: ...Operation and Assembly Instruction SF6 insulated Switchgear Type MINEX E 12 36kV State 05 2017 DRIESCHER WEGBERG...
Page 2: ...DRIESCHER WEGBERG MINEX E 2 Alle Rechte vorbehalten All rights reserved DRIESCHER WEGBERG 2017...
Page 3: ...ion springs 4 6 cylinder head screws M8x50 with big discs spring rings and half bolts 5 5 spacing bush 6 4 hexagon head screws M12x55 with spring rings and bolts 7 1 hexagon head screw M12x70 with dis...
Page 4: ...wo non sealed inner hexagon screws per phase by the cylinder head screws 4 if these are not factory available Coat the coupling isolation part 1 with the supplied fitting lubrication 2 Place the coupl...
Page 5: ...holes 7 Lead the switching cubicles parallel together Take care not to tilt the cubicles 8 First secure the two switching cubicles in the base box by easy screwing the bolts 9 Place each in the front...
Page 6: ...os 3 and 5 14 Tighten the switching cubicles with the screws together until the cubicles are close to each other without a gap The switching cubicles are connected in the right way when the cubicle fr...
Page 7: ...gs in the new end cubicle Remove the nine non sealed screws see point 4 on that side of the cubicle where the voltage proof tubing plugs have to be installed Three of the screws have to be screwed in...