5-2
Installation, Setup, and Operation
HPG 13150 400 V (A)
Dressler
®
HF-Technik GmbH
Prerelease version
Installation Requirements
Install this unit according to the following requirements.
Unpacking
Unpack and inspect the unit carefully, looking for obvious physical damage. If
no damage is apparent, proceed with the installation. If you do see signs of
shipping damage, contact Dressler
®
HF-Technik GmbH and the carrier
immediately (see
“Customer Support” on page 6-21
). Save the shipping
container for submitting necessary claims to the carrier.
Operating and maintenance personnel must receive proper training
before installing, troubleshooting, or maintaining high-energy electrical
equipment. Potentially lethal voltages could cause death, serious
personal injury, or damage to the equipment. Ensure that all appropriate
safety precautions are taken.
RISK OF DEATH OR BODILY INJURY. Disconnect and lockout/tagout all
sources of input power before working on this unit or anything
connected to it.
Maintenance personnel must set the taps for the correct voltage level at
the mains. Changing the taps is a technical procedure that can only be
done by properly trained personnel. For more information on changing
the taps, see the HPG generator service manual.
Summary of Contents for 13150 400 V
Page 2: ......
Page 3: ...User Manual Prerelease version HPG Generator Model 13150 400 V HPG 13150 400 V A ...
Page 6: ...iv HPG 13150 400 V A Dressler HF Technik GmbH Prerelease version ...
Page 12: ...x List of Figures HPG 13150 400 V A Dressler HF Technik GmbH Prerelease version ...
Page 14: ...xii List of Tables HPG 13150 400 V A Dressler HF Technik GmbH Prerelease version ...
Page 104: ...4 66 Communication Interfaces HPG 13150 400 V A Dressler HF Technik GmbH Prerelease version ...