
© DreamLine
®
All Rights Reserved
© DreamLine
®
All Rights Reserved
Tools Needed
Parts Needed
Marking and Cutting the Top and Bottom Guide Rails
SAPPHIRE-V Shower and Tub Door Manual Ver 1 Rev1 05/2022
9
© 2022 DreamLine® All Rights Reserved
Fig 2
NOTE
Cut the
Upper Guide Rail (#01)
and the
Bottom Rail (#08)
to fit the finished opening
according the measurements at each location, using either a compound miter saw (preferred)
or a hacksaw and miter box:
◻
Cut the
Upper Guide Rail (#01) to:
“W1”(top) dimension - 9/16” (Fig 2a)
◻
Cut the
Bottom Rail (#08) to:
“W2” (bottom) dimension - 1/16” (Fig 2b)
01
x1
08
x1
W 1 - 9/16”
W 2 - 1/16”
1
2
Tip:
Use a metal file to
remove any burrs from
the cut ends of the rails.
Top Guide Rail
Bottom Guide Rail
2