background image

 

Oceana / DLG-63   

Shower Cabin Installation and User’s guide 

 

I.  Mounting Preparation 

1.

 

After opening the case, read this introduction carefully, check all the packed parts, examine the shower 
cabinet for shipping damage. If the unit has been damaged or has a finishing defect, please contact your local 
distributor within 2 business days. Please note that DreamLine Guarantee will not cover shipping damage or 
such finishing defects once the unit has been installed. Your distributor’s responsibility for damage in transit 
is limited after the shower package has been transferred to the transportation company, so you may have to 
contact the transportation company directly to report damage. Contact your distributor or DreamLine if you 
have any questions. 

2.

 

You should make sure that the floor is leveled and solid and will be able to support the total weight of the unit 
and its occupant. You should also consult your local building codes on questions on installation compliance 
standards. 

3.

 

Install all of the required plumbing and drainage before securing the shower. Use a competent and licensed (if 
required by local code) plumber for all plumbing installation. 

4.

 

Please insure that prior to the installation the floor is leveled and the walls are at right angles.    While some 
adjustment in leveling of the tray is possible, irregular floor level or improper angle of side walls will result in 
serious problems for your installation. Please, note that there are some adjustments and drilling might be 
necessary during the installation process

ю

 

5.

 

Necessary Tools: Screwdriver, Electric drill, Regular drill bits (1/8”, 7/64”), Phillips screwdriver, Level, 
Measuring tape, Pencil and Stepladder. Bear in mind that you will need at least two people to assemble the 
unit. 

© 2002-2006 DreamLine™. All Rights Reserved                                                                          Oceana/DLG-63 

1

Reviews: