Oceana / DLG-63
Shower Cabin Installation and User’s guide
I. Mounting Preparation
1.
After opening the case, read this introduction carefully, check all the packed parts, examine the shower
cabinet for shipping damage. If the unit has been damaged or has a finishing defect, please contact your local
distributor within 2 business days. Please note that DreamLine Guarantee will not cover shipping damage or
such finishing defects once the unit has been installed. Your distributor’s responsibility for damage in transit
is limited after the shower package has been transferred to the transportation company, so you may have to
contact the transportation company directly to report damage. Contact your distributor or DreamLine if you
have any questions.
2.
You should make sure that the floor is leveled and solid and will be able to support the total weight of the unit
and its occupant. You should also consult your local building codes on questions on installation compliance
standards.
3.
Install all of the required plumbing and drainage before securing the shower. Use a competent and licensed (if
required by local code) plumber for all plumbing installation.
4.
Please insure that prior to the installation the floor is leveled and the walls are at right angles. While some
adjustment in leveling of the tray is possible, irregular floor level or improper angle of side walls will result in
serious problems for your installation. Please, note that there are some adjustments and drilling might be
necessary during the installation process
ю
5.
Necessary Tools: Screwdriver, Electric drill, Regular drill bits (1/8”, 7/64”), Phillips screwdriver, Level,
Measuring tape, Pencil and Stepladder. Bear in mind that you will need at least two people to assemble the
unit.
© 2002-2006 DreamLine™. All Rights Reserved Oceana/DLG-63
1