User Manual of CIC-D100 Ion Chromatograph
54
5. Install new conductivity cell aiming at the pinhole of DB joint;
6. Tighten the fixing screws of the conductivity cell;
7. Reconnect the conductivity cell pipeline;
8. Power up the instrument again, turn on the pump to flush the conductivity cell and
resume operation.
Figure 6-4 Replacement of conductivity cell
:
to avoid impurities in the pipeline in the new conductivity cell, the new
conductivity cell needs to be rinsed with ultrapure water for about 12h first.
6.6 Replacement of amperometric detection cell gasket
When configuring the amperometric detector, replace the amperometric detection cell gasket as
follows:
1. Turn off the amperometric detection cell, stop the pump and turn off the power supply of
the instrument;
2. Remove the connecting pipes and electrode connecting cables at the inlet and outlet of the
amperometric detection cell;
3. Pull out the amperometric detection cell forward;
4. Loosen the fixing knob of the working electrode, clamp the clamping pins on both sides
of the potential positioning block of the working electrode, pull the working electrode out of
the positioning hole, and carefully remove it;
5. Use tweezers to peel off the old gasket from the cell body;
Screw off
PEEK joint
disconnected
Caution