The quick connect coupling must engage. When 

connecting, make sure that a click is heard. If necessary, 

pull on the hose and check whether the connection is tight.

5. Note the assembly date or expiration date on the housing 

of the CO

2

 absorber where applicable.

5.2.5.4  Installing the breathing air cooler

1. If an ice cooler is used, only insert the ice packs in the ice 

cooler just before use. (The breathing circuit does not 

open again when the ice packs are inserted.)

If a regeneration cooler is used, insert the block of 

14 cooling elements, which are held together by a sealing 

cuff, in the breathing air cooler. The filler pipes of the 

cooling elements and the handle of the sealing cuff must 

point towards the open side of the breathing air cooler. 

Wet the sealing cuff if necessary to ensure it slides into the 

housing easily and correctly.

2. Close the breathing air cooler (see "Lids of the 

regeneration cooler and CO

2

 absorber", page 15).

3. Fasten the breathing hose on the breathing air cooler (see 

"Breathing hoses", page 14).

4. Place the breathing air cooler in the mounts on the 

carrying frame. A clicking sound can be heard when the 

breathing air cooler engages in the locking mechanism.

5. Connect the red medium-pressure hose to the breathing 

air cooler.

The quick connect coupling must engage. When 

connecting, make sure that a click is heard. If necessary, 

pull on the hose and check whether the connection is tight.

5.2.5.5  Fitting the connecting piece

The valve discs must be clean and intact and be in contact 

with the entire circumference of the valve seat. Replace faulty 

valve discs!

1. Place valve discs on the valve seats if necessary.
2. Insert the direction valves in the connecting piece and 

rotate slightly so that they slide into the openings of the 

connecting piece. The direction valves must finish flush 

with the edge of the connecting piece.

The direction valves are identical. The direction of 

installation is coded with 3 recesses on one side 

and 4 recesses on the other side. The recesses fit into the 

corresponding contours in the connecting piece.

The direction arrow on the connecting piece indicates the 

direction in which the valve discs must open.

3. Visually inspect the O-ring (1). It must be clean and intact. 

Replace the O-ring if faulty.

4. Grease the O-ring with Molykote 111 if necessary so that 

the connecting piece can easily be inserted in the full face 

mask when donning the closed-circuit breathing 

apparatus.

5. Fit the protective cap (2) to the connecting piece.
6. Fit the breathing hoses to the connecting piece.
7. Fasten the breathing hoses on the shoulder straps with 

the safety loops.

51999

52520

44936

1

2

Summary of Contents for BG ProAir

Page 1: ...Instructions for use Dr ger BG ProAir More languages available for download at draeger com ifu Dr ger BG ProAir...

Page 2: ......

Page 3: ...200 0 02 bar h elapsed time 1 4 2 3 27 27 11 16 9 10 8 29 28 24 25 26 14 15 12 13 19 20 23 22 21 5 6 7 17 18 31 30 8 7 6 9 1 2 3 4 5...

Page 4: ...digitalt exemplar p andra spr k i databasen f r teknisk doku mentation www draeger com ifu SV 9300712 ET Selle kasutusjuhendi saab teistes keeltes elektroonili sel kujul alla laadida tehnilise dokume...

Page 5: ...use 12 4 3 1 Freezing the ice packs for apparatuses with ice cooler 12 4 3 2 Inserting ice packs for apparatuses with ice cooler 12 4 3 3 Donning the closed circuit breathing apparatus 12 4 3 4 Activ...

Page 6: ...to potential hazards The meanings of the warning notices are defined as follows 2 2 Trademarks The following website lists the countries in which the trademarks from Dr ger are registered www draeger...

Page 7: ...g cooler options are available Ice cooler The ice cooler contains ice packs that can be refrozen after use Regeneration cooler The regeneration cooler PCM phase chage material cooler contains a latent...

Page 8: ...following information is shown when the compressed oxygen cylinder is opened Other information and queries are shown if the Connect ECU is turned on differently pushbutton insertion of batteries remo...

Page 9: ...mmersion of the apparatus in water e g when navigating a waterhole in a mine will not impair the function of the closed circuit breathing apparatus If the closed circuit breathing apparatus has been c...

Page 10: ...ion on approvals see supplement 9300233 3 6 Type identifying markings and explanation of symbols 3 6 1 Type identifying marking The type identifying marking of the BG ProAir Class 4P is located on the...

Page 11: ...ored for 6 months The apparatus must have successfully passed the leak test and be sealed with the protective cap The air tight shrink wrapped or installed CO2 absorber was not transported on a vehicl...

Page 12: ...ing aid to prevent the ice packs from deforming Make sure that no ice is deposited on the ice packs If necessary place ice packs in a bag seal the bag and freeze the ice packs whilst they remain in th...

Page 13: ...g the automatic distress signal function Remove the function key from the Connect ECU This activates the motion sensor The symbol is displayed 4 4 During use 4 4 1 General information The chemical pro...

Page 14: ...ecess when tightening the bayonet ring Rotate the bayonet ring clockwise onto the connection to fasten the breathing hose The breathing hose is correctly fitted when a clicking sound is heard while ti...

Page 15: ...k the catches on the fasteners under the tabs see Figure B 1 Push the fasteners closed see Figure B 2 Connecting piece The direction of flow is marked with an arrow on the connecting piece The directi...

Page 16: ...g circuit may contain base which may leak when disassembling the closed circuit breathing apparatus and lead to chemical burns Avoid skin contact Wear protective gloves and goggles In case of eye cont...

Page 17: ...th release levers 1 Swivel the spring bridge 90 and remove it from the closed circuit breathing apparatus 2 Release the locking mechanisms between the CO2 absorber and breathing bag as well as between...

Page 18: ...4 Prepare the CO2 absorber Dispose of the disposable absorber For the refill absorber remove the soda lime and the two non woven mats and discard them The sieve can be reused after disinfection 5 2 3...

Page 19: ...rmation 5 2 5 Assembling the closed circuit breathing apparatus 5 2 5 1 Overview 1 Install the CO2 absorber see Installing the CO2 absorber page 19 2 Install the breathing air cooler see Installing th...

Page 20: ...nect the red medium pressure hose to the breathing air cooler The quick connect coupling must engage When connecting make sure that a click is heard If necessary pull on the hose and check whether the...

Page 21: ...th the locking mechanisms to the CO2 absorber and breathing air cooler Every locking mechanism has two lock buttons with engagement hooks Ensure the locking mechanisms on the CO2 absorber and breathin...

Page 22: ...en the Connect ECU on the shoulder strap 5 2 6 Testing the closed circuit breathing apparatus 5 2 6 1 Notes for testing The following test sequence applies for both apparatuses with constant oxygen do...

Page 23: ...he selector switch on the test unit to 2 Tightly pinch the exhalation hose with your hand Use the face spanner from the BG ProAir Test Set if necessary 3 Pump once The test unit must display at least...

Page 24: ...ically turns on and runs a self test 3 Briefly press the bypass button Oxygen must be heard to flow into the circuit flow noise 5 2 6 13 Checking the minimum valve 1 Set the selector switch on the tes...

Page 25: ...b 400 when handling the CO2 absorber WARNING Reduced period of use possible If the expiration date of the soda lime is exceeded the intended period of use for the apparatus may not be reached Note the...

Page 26: ...s are shown on the display 7 Confirm the battery type 8 Turn off the Connect ECU 6 Transport Condensate forms in the breathing circuit during use After use transport the closed circuit breathing appar...

Page 27: ...5 L min Bypass 80 L min Minimum valve 80 L min Temperature during continu ous use1 1 according to EU type examination 6 C to 30 C Air pressure 900 hPa to 1200 hPa Relative humidity 0 100 Storage temp...

Page 28: ...ylinder 2 200 O2 CGA USA R360395 BG ProAir 2 200 O2 Configurator R360560 Accessories Dr ger FPS 7000 RP R56326 Dr ger FPS COM 5000 R62700 klar pilot anti fogging spray R56542 BG ProAir disposable abso...

Page 29: ...tightness test with positive pressure Lower pressure to 7 0 5 mbar Press OK button Pressure difference 1 mbar min Engage lever in spring bridge Pump to activate Opens between 4 and 8 mbar Relief valve...

Page 30: ...e pressure Lower pressure to 7 0 5 mbar Press OK button Pressure difference 1 mbar min Relief valve Engage lever in spring bridge Pump to activate Opens between 4 and 8 mbar Bypass Open cylinder Brief...

Page 31: ...Annex Instructions for use Dr ger BG ProAir 31...

Page 32: ......

Page 33: ......

Page 34: ...9300708H Manufacturer Dr ger Safety AG Co KGaA Revalstra e 1 D 23560 L beck Germany 49 451 8 82 0 9300708 1114 800 en Dr ger Safety AG Co KGaA Edition 01 2021 10 Subject to alterations www draeger com...

Reviews: