DQ HEATING DUNE User Manual Download Page 1

Dune Radiator Fixing Instructions

 

Please unpack your delivery carefully and inspect the radiator and contents 

 

any damages or shortages must be notified to your supplier within 3 days of 
delivery of your goods.  

Technical Specifications 

Materials 

Stainless Steel 

Connections 

½” 

Flow and 

Return 

Test Pressure 

7

 Bar

Testing Authority  

EN442 

Max operation pressure  

 4 Bar 

Max working temperature  

95c 

These can be cleaned using a soft damp cloth 
with a non-abrasive cleaning product. 

PLEASE  NOTE:  That  in  accordance  with  Part  L1  2006  of  the  Building  Regulations  and  BS7593:1992  code  of  practice  for  the 
treatment of hot water and central heating systems, we recommend flushing the heating system before installation of new 
radiators  and  then  adding  the  correct  quantity  and  type  of  inhibitor  for  use  with  the  radiator  and  system  to  prevent 
corrosion.    Damage  caused  to  systems  not  protected  by  a  suitable  inhibitor  will  not  be  covered  by  the  manufacturer 
warranty.

 

It is the responsibility of the installer to ensure the correct use and suitability of the fixings provided.  No liability 

for costs or damages arising from failure to do so can be accepted. 

SPECIFICATION FOR DUNE

Reviews: