The Big Lebowski Pinball
|
Operations Manual
MAIN FUNCTION
32
SOLENOID TEST
If you activate this test, it will show you first which coils (solenoids) are available for testing.
Important notice: the stepper motors are operated at 12VDC and coils are operated at 48VDC. With an
open coin door, these voltages are disabled so the coils and stepper motors will NOT work. You have to
pull the pin of the white interlock switch located on a bracket at the left side of the coin door to supply
the desired voltage to the playfield and to be able to test the coils and stepper motors.
With the + - buttons, you can select the coil you want to test.
If you select Flippers you will get the choice which flipper you want to test.
Summary of Contents for THE BIG LEBOWSKI
Page 8: ...INTRODUCTION THE BIG LEBOWSKI The Big Lebowski Pinball Operations Manual 8 ...
Page 11: ...GAME SETUP INSTRUCTION GAME SETUP INSTRUCTION The Big Lebowski Pinball Operations Manual 11 ...
Page 26: ...GAME CONTROL LOCATIONS The Big Lebowski Pinball Operations Manual GAME CONTROL LOCATIONS 26 ...
Page 29: ...MENU FUNCTION 29 MAIN FUNCTION The Big Lebowski Pinball Operations Manual ...
Page 67: ...GAMEPLAY RULES 67 GAMEPLAY RULES The Big Lebowski Pinball Operations Manual ...