8
7.8 Use a ceramic glass product generally sold for cleaning
ceramic hobs to clean the glass front.
The glass frame must be refitted to the appliance following
cleaning or servicing.
7.9 Ensure that the rope seal on the back of the glass frame is
intact and replace the screws working from the top down.
Tighten the screws evenly DO NOT OVER TIGHTEN, see
Diagram 12.
12
7.10 Replace ALL of the securing screws ensuring that a screw is
present in all fixing slots.
UNDER NO CIRCUMSTANCES SHOULD THE
APPLIANCE BE USED IF ANY OF THE FRAME
RETAINING SCREWS ARE LOOSE OR MISSING.
NEVER OPERATE THE APPLIANCE WHEN THE GLASS
FRAME IS REMOVED, OR THE GLASS IS BROKEN.
7.11 With the top still supported or removed refit front by locating
in grooves and lowering into place, see Diagram 13.
13
7.12 Now replace top, see Diagram 14.
14
User Instructions
8. Flue Sure System
8.1 The appliance is fitted with the Dovre Flue Sure System,
which will act to cut off the gas supply to the burners in the
event of incorrect operation of the flue. If the system acts to
cut off the gas supply, this indicates that there is insufficient
flue pull. If this occurs a minimum of 10 minutes should be
allowed before trying to relight.
Continued operation of this safety device means there may
be a serious problem with the flue system. A qualified gas
engineer should inspect this.
DO NOT USE THE APPLIANCE UNTIL AN ENGINEER
SAYS IT IS SAFE TO DO SO.
9. Flame Failure Device
9.1 This is a safety feature incorporated on this appliance which
automatically switches off the gas supply if the pilot goes out
and fails to heat the thermocouple.
10. Running In
10.1 During initial use of a new Dovre appliance a strong odour
will be encountered as various surface coatings become hot
for the first time. Although these odours are harmless it is
recommended that the appliance is operated on maximum
for 4 to 8 hours in order to fully burn off these coatings. After
this period the odours should then disappear.
If the odours persists, please contact your installer for advice.
10.2 During the first few hours of burning there may be
discolouration of the flames. This will also disappear after a
short period of use.
11. Servicing
11.1 The appliance must be serviced every 12 months by a
qualified Gas Engineer. In all correspondence always quote
the Model number and the Serial number which may be
found on the Commissioning Checklist (Page 3).
12. Ventilation
12.1 Any purpose provided ventilation should be checked
periodically to ensure that it is free from obstruction.
13. Installation Details
13.1 Your installer should have completed the commissioning
sheet at the front of this book. This records the essential
installation details of the appliance. In all correspondence
always quote the Model number and Serial number.
14. Hot Surfaces
14.1 Parts of this appliance become hot during normal use.
Regard all parts of the appliance as a ‘working surface’.
14.2 Provide a suitable fire guard to protect young children
and the infirm.
Summary of Contents for 280
Page 28: ...E O E ...