Page 68 of 145
8 Conduit & Cabinet Installation
8.1 Console Installation
Mount the SiteSentinel® iSite™ console on a wall in a secure indoor
location using the mounting holes provided, or use the rubber feet
included and place on any flat surface for easy access. If possible,
align the console so the display is easily visible and at a comfortable
eye level (approximately 5 to 6 feet (1.5 to 1.9 m) above ground if
mounted on a wall). Knockout locations are shown below.
Figure 8-1 Console Knockouts
Figure 8-2 Console Mounting Dimensions
Summary of Contents for OPW SiteSentinel iSite
Page 15: ...Page 15 of 145 www opwglobal com Figure 2 4 Console Connectivity ...
Page 17: ...Page 17 of 145 www opwglobal com Figure 2 6 Wiring Connections ...
Page 22: ...Page 22 of 145 www opwglobal com Figure 2 11 Standard Twisted Pair Petro Net Installation ...
Page 25: ...Page 25 of 145 www opwglobal com Figure 2 14 Petro Net Over Ethernet Option ...
Page 33: ...Page 33 of 145 www opwglobal com ...
Page 34: ...Page 34 of 145 www opwglobal com Figure 4 1 924B Probe Installation ...
Page 61: ...Page 61 of 145 www opwglobal com Figure 5 22 In Tank Probe Setup ...
Page 74: ...Page 74 of 145 www opwglobal com Figure 9 3 Dry Well Monitoring Single Wall Tank ...
Page 78: ...Page 78 of 145 www opwglobal com Figure 9 7 Double Wall Tank with Well Monitoring ...
Page 90: ...Page 90 of 145 www opwglobal com Figure 13 7 ACR RIM Jumper Board ...
Page 142: ...Page 142 of 145 www opwglobal com Declaration of Conformity ...
Page 143: ...Page 143 of 145 www opwglobal com ...