116
LEADING IN PRODUCTION EFFICIENCY
Operating Manual
© Dürr Systems AG
ED3K_Operating_Manual_Rev02LD_03Lug2020_EN. docx
Rev.02 – 03.07.2020
9.1 Control panel
The electrical equipment must be examined once a year to ensure it is in a suitable condition.
In particular, check the correct tightening of terminal screws
image indicative
The
EcoDose 3K
PLC usually does not need any maintenance.
The
EcoDose 3K
PLC is provided by a flash memory and does not need the installation of a buffer
battery.