Operating Manual
© Dürr Systems AG
94 / 156
EcoBell2 SL EC - Rotating Atomizer with External Charging
Cleaning and maintenance
Document No.: MRA00001EN
Version:: 07
•
As of:: 01/2020
7.5
Maintenance work
Staff:
- Assembly personnel
Protective equipment:
- Protective work wear
- Protective glasses
- Protective gloves
- Safety boots
The maintenance intervals are found in the maintenance plan. The
work is described below:
- Dismantling and installing the bell disk
- Dismantling and installing the nozzle
- Replacing the electrodes
- Dismantling and installing the atomizer body
- Cleaning the shaping air ring
- Replacing the contact ring.
Maintenance position
In the Maintenance position, the atomizer is inclined upwards. In this
position, residues of the liquid remain largely in the atomizer. This
position is suitable for all maintenance work.
Fig. 44: Maintenance position
Pos: 49 /INP/ Bell2/07_05_01 GT_Montage _AA @ 57\mod_1503999321983_20.do cx @ 620169 @ 34455544 @ 1