
DV11
Operation and Maintenance
109
Engine Reassembly
Printed in Mar. 2005 PS-MMA0608-E1A
Connecting rod bolt
3.5 kg.m
Liner fixing bolt
4 kg.m
Torque
Head bolt
3 kg.m
3.3.31. Power steering pump
z
Assemble the power steering pump
to the fly wheel housing.
z
Set the power steering pump to the
driving coupling carefully to prevent
from damage of the O-ring.
z
Assemble the steering pump fixing
bolt by specified torque.
Torque 4.4
kg.m
3.3.32. Power take off (P.T.O)
z
Assemble the P.T.O assembly to
the fly wheel housing carefully to
prevent from damage of the O-ring.
z
Assemble the P.T.O gear fixing nut
and coupling nut by specified
torque.
Downloaded from
www.Manualslib.com
manuals search engine