
DV11
Operation and Maintenance
104
Engine Reassembly
Printed in Mar. 2005 PS-MMA0608-E1A
3.3.20. Fuel high pressure pump
z
Assemble the gear of the fuel high
pressure pump by using specified
tool.
Gear nut torque
11±0.5 kg.m
z
Install the fuel high pressure pump
on the backside of the fly wheel
housing.
z
Assemble the stud bolt after apply
the loctite.
z
Assemble the fuel high pressure
pump fixing bolts with specified
torque.
Torque 4.4
kg.m
3.3.21. Intake manifold
z
Attach a new gasket to the cylinder
head side.
z
Assemble the intake manifold by
tightening the fixing bolts.
z
Assemble both sides by the above
method.
z
Attach a gasket to the equalizing
pipe that connects the intake
manifolds of both sides and
assemble both manifolds by
tightening the fixing bolts.
Torque 2.2
kg.m
Fuel high
pressure pump
Driving gear
Downloaded from
www.Manualslib.com
manuals search engine