11
56”
36”
4”
10.5”
24” depth up to 8,000 lb. gate.
36” depth up to 20,000 lb. gate.
4”
10.5”
12”
12”
12”
12”
Wire Mesh
1.4 Concrete Pad Description
•
Use 1/2” re-bar.
•
Wire mesh is highly recommended.
•
4 underground conduits recommended:
- High voltage AC power
- Low voltage controls
- Reverse loops
- Automatic exit loop.
Above ground conduits can be routed
after
the operator has
been installed using junction boxes if desired.
•
Position operator approximately 4 inches away from the
gate frame and secure to concrete with sleeve anchors.
See next page for further information.
Top View
End View
Front View
Back Anchor Foot
Front Anchor Foot
Concrete Pad
Conduit
Area
Front Anchor Foot
Front
Anchor
Foot
Back
Anchor
Foot
Above Ground
Re-bar
Re-bar
Re-bar
Sleeve
Anchors
Note: Minimum suggested pad
size. The pad size will vary for
each installation. It is important
to have enough concrete mass
in the ground to securely
anchor the operator. This
prevents the pad from shifting
in the ground when cycling
very heavy gates.
Be sure the top of the concrete pad is level and a minimum of four
(4) inches above ground level. We suggest that you contact the
local building department to determine the required depth
of the pad since soil conditions and code requirements
vary from city to city.
Front View
End View
Above Ground
Top View
To
p MUST
Be Level!
Gate Frame
Summary of Contents for Series 9500
Page 2: ......