2348-065-D-12-07
Page
11
Section 2 - Control Cabinet Installation
Installation of the 2348-010 elevator control board(s) and cabinet(s) should be coordinated with the
elevator service company. The cabinets should be installed in close proximity to the elevator
electronic control panel so that wiring between the elevator electronic control panel and the 2348-010
board(s) is simplified. 110 VAC power must be available nearby to power the transformer(s) that will
supply 16 VAC power to the 2348-010 board(s). One 16 VAC power transformer is required for each
elevator car (shaft) controlled.
1. Open the cabinet and remove any ribbon cables from the 2348-010 board (systems with
two or more boards only).
2. Remove the four screws from each corner of the board and then remove the board from
the cabinet.
CAUTION: Touch a proper ground with your hands before removing
the board(s) from the cabinet
. This will discharge any static electricity and prevent
electrostatic discharge damage to the board.
3. Mount the cabinets. Each cabinet has four mounting holes located in the corners. Be
sure that the mounting screws do not protrude into the cabinet in such a way that they
can cause a short to the back of the 2348-010 board.
4. Make any conduit connections at this time.
5. Clean out the cabinet being sure that any metal shavings are removed from the cabinet.
6. Re-install the 2348-010 board(s) and the ribbon cables.
Summary of Contents for 2348
Page 2: ...Page 2 2348 065 D 12 07...
Page 4: ...Page 4 2348 065 D 12 07...
Page 6: ...Page 6 2348 065 D 12 07...
Page 14: ...Page 14 2348 065 D 12 07...
Page 34: ...Page 34 2348 065 D 12 07...