
Support
Post
Brac
ket
Bracket
Cover
U-Bolt
Clamp
U-Bolt
Clamp
Rou
te wire
through
conduit.
Support Post
Assembly
Use e
xisting
cir
cuit board
bracket bolts
to mount
support post
bracket.
Drill 7/8” hole
centered where
elbow touches
operator housing
(Approximately 18” down
from the top of operator).
Secure 3/4” conduit nipple
in drilled hole with
conduit nut .
2” conduit nut to secure elbow.
Use 2” conduit
nuts to secure
traffic light
assembly to
support post.
Route wire through
support post.
Traffic Light
Assembly
2” Elbow
Shut off AC power to operator.
Turn off DC power switch on certain models.
This kit is designed for the 1600 model barrier gate operators. Recommended for the 1603 auto spike system. The traffic signal is
synchronized with the gate operator’s up/down cycle. The red light stays on and only changes to green when the operator’s arm is
fully raised.
2” Threaded Elbow
2” Conduit Nut (3)
5/8” Cover Bracket
bolt and lockwasher
(2 sets)
3/4” Conduit Nipple
and Conduit Nut
U-Bolt Clamp with
lockwashers and nuts
(2 sets)
Kit Includes:
Plastic Traffic Light Assembly (Factory wired)
2” Threaded Support Post
Support Post Bracket
Bracket Cover.
Hardware:
TRAFFIC LIGHT AND MOUNTING KIT
Installation
DoorKing Part Number
1603-210
120 Glasgow Avenue
Inglewood, California 90301
U.S.A.
Assemble Support Post
Mount Support Post Assembly to Operator
Support Post
1
2
www.leedan.com [email protected] Toll-Free: 800-231-1414