DoorKing 1603-210 Installation Download Page 1

Support

Post

Brac

ket

Bracket

Cover

U-Bolt
Clamp

U-Bolt
Clamp

Rou

te wire

through

conduit.

Support Post

 Assembly

Use e

xisting

cir

cuit board

bracket bolts

to mount

support post

bracket.

Drill 7/8” hole
centered where 
elbow touches
operator housing
(Approximately 18” down
from the top of operator).
Secure 3/4” conduit nipple 
in drilled hole with
conduit nut .

2” conduit nut to secure elbow.

Use 2” conduit
nuts to secure 
traffic light
assembly to
support post.

Route wire through
support post.

Traffic Light
Assembly

2” Elbow

Shut off AC power to operator.
Turn off DC power switch on certain models.

This kit is designed for the 1600 model barrier gate operators. Recommended for the 1603 auto spike system. The traffic signal is 
synchronized with the gate operator’s up/down cycle. The red light stays on and only changes to green when the operator’s arm is 
fully raised.

2” Threaded Elbow

2” Conduit Nut (3)

5/8” Cover Bracket
bolt and lockwasher
(2 sets)

3/4” Conduit Nipple 
and Conduit Nut

U-Bolt Clamp with
lockwashers and nuts
(2 sets)

Kit Includes:

 

Plastic Traffic Light Assembly (Factory wired)
2” Threaded Support Post
Support Post Bracket
Bracket Cover.

Hardware:

TRAFFIC LIGHT AND MOUNTING KIT

Installation

DoorKing Part Number

1603-210

120 Glasgow Avenue

Inglewood, California 90301 

U.S.A.

Assemble Support Post

Mount Support Post Assembly to Operator

Support Post

1

2

www.leedan.com   [email protected]   Toll-Free: 800-231-1414

Reviews: