Downflo Workstation, DWST 4-1 to 6-4
A4
DWST 4-1 and 6-1 Single Power Module Installation
1. Install all lifting eyes (Four (4) per power module). Lifting eyes are shipped loose and install on roof of DWST.
2. Connect lifting sling or chains to the four lifting eyes located on the roof of the DWST.
3. Move the power module into position. Provide a minimum of 24-inches between rear side of collector and the wall for product
maintenance.
Note: Using the bolt hole plug pack, shipped loose, plug the bolt holes on the power module face with M8 x 20 mm bolts
and washers provided.
4. Lifting eyes can be removed once collector is in place to install more power modules and for mounting accessories on roof.
DWST 4-1 and 6-1 Single Power
Module Installation
lifting eyes
inlet