Downflo Workstation, DWST 4-1 to 6-4
A2
Collector Location and Site Selection
Equipment location must conform to all codes and standards, should be suitable for the type of dust being handled and should
ensure easy access for service and utility connections. Site selection must account for wind, seismic zone, and other load
conditions. Collector is intended for indoor installation.
The equipment must be anchored once in final position. Foundation or support framing must be capable of supporting dead, live,
wind, seismic and other applicable loads. Consult a qualified engineer for final selection of foundation or support framing.
Collector Installation
Electrical installation (including bonding and grounding of the collector) must be performed by a qualified electrician.
This equipment is not designed to support site ducts, piping, or electrical services. All ducts, piping, or electrical
services must be adequately supported to prevent injury and/or property damage.
Do not install in classified hazardous atmospheres without an enclosure rated for the application.
Service must be performed by trained and qualified maintenance personnel.
Equipment may reach peak sound pressure levels above 80 dB (A). Noise levels should be considered when
selecting collector location.
Provisional Anchor Bolt Recommendations
The quantity of anchor bolts should match the number of holes provided in the base of the collector. Anchor diameter is typically
1/8-inch less than the base hole diameter.