background image

 

 

1

1

1

1    

ÍNDICE

ÍNDICE

ÍNDICE

ÍNDICE    

Pág.

Pág.

Pág.

Pág.    

1 LIST OF COMPONENTS .................................................................................................................................................2

 

2 INSTALLATION INSTRUCTIONS ..................................................................................................................................3

 

2.1

 

H

YDRAULIC INSTALLATION

.................................................................................................................................................................. 4

 

2.2

 

L

OCATION

............................................................................................................................................................................................. 6

 

2.3

 

P

RESURE AND TEMPERATURE RELIEF VALVE INSTALLATION

.............................................................................................................. 6

 

2.4

 

E

LECTRICAL CONNECTION TO THE BOILER

.......................................................................................................................................... 8

 

2.5

 

E

LECTRICAL INSTALLATION OF THE 

RESISTOR

 

KIT .......................................................................................................................... 8

 

2.6

 

C

ATHODIC PROTECTION

.....................................................................................................................................................................10

 

2.7

 

C

HARACTERISTICS OF THE WATER

.....................................................................................................................................................10

 

3 OPERATION.................................................................................................................................................................... 11

 

4 DELIVERY OF THE SYSTEM........................................................................................................................................ 11

 

5 MAINTENANCE ............................................................................................................................................................. 12

 

5.1

 

E

MPTYING THE 

DHW

 TANK

...............................................................................................................................................................12

 

6 TECHNICAL CHARACTERISTICS ............................................................................................................................... 13

 

7 CIRCULATING PUMP STATUS CODES.................................................................................................................... 13

 

8 DIAGRAMS AND MEASUREMENTS......................................................................................................................... 14

 

8.1

 

HTP

 

100-150

 AND 

HTP

 

130-200

 TANKS

.....................................................................................................................................14

 

9 SPARES LIST ................................................................................................................................................................... 15

 

9.1

 

HTP

 

100-150

 TANKS

........................................................................................................................................................................15

 

9.2

 

HTP

 

130-200

 TANKS

........................................................................................................................................................................16

 

10 GUARANTEE CONDITIONS ..................................................................................................................................... 17

 

  

Summary of Contents for HTP 100-150

Page 1: ...INSTALLATION AND OPERATING INSTRUCTIONS HTP HTP HTP HTP ER 0170 1996 CGM 04 392 ...

Page 2: ...g the manufacturer s instructions Start up of these storage tanks and any maintenance operations must only be carried out by DOMUSA DOMUSA DOMUSA DOMUSA s Authorised Technical Assistance Services Incorrect installation of these storage tanks could result in damage to people animals or property and the manufacturer will not be held liable in such cases Domusa Domusa Domusa Domusa informs all partie...

Page 3: ...OILER 8 2 5 ELECTRICAL INSTALLATION OF THE RESISTOR KIT 8 2 6 CATHODIC PROTECTION 10 2 7 CHARACTERISTICS OF THE WATER 10 3 OPERATION 11 4 DELIVERY OF THE SYSTEM 11 5 MAINTENANCE 12 5 1 EMPTYING THE DHW TANK 12 6 TECHNICAL CHARACTERISTICS 13 7 CIRCULATING PUMP STATUS CODES 13 8 DIAGRAMS AND MEASUREMENTS 14 8 1 HTP 100 150 AND HTP 130 200 TANKS 14 9 SPARES LIST 15 9 1 HTP 100 150 TANKS 15 9 2 HTP 13...

Page 4: ... 7 7 7 8 8 8 8 9 9 9 9 1 1 1 1 2 2 2 2 3 3 3 3 4 4 4 4 5 5 5 5 6 6 6 6 7 7 7 7 8 8 8 8 9 9 9 9 1 1 1 1 Expansion vessel 2 2 2 2 Filling valve 3 3 3 3 Storage tank feed pump 4 4 4 4 Automatic air bleed valve 5 5 5 5 DHW storage tank 6 6 6 6 Pressure and temperature relief valve 7 7 7 7 Dielectric sleeves 8 8 8 8 Heating element flange 9 9 9 9 Draining valve ...

Page 5: ...bioCLASS NG is as follows A DHW outlet B DHW inlet C Boiler flow D Boiler return 1 3 litre DHW expansion tank 2 Filling valve 3 High efficiency tank feed pump 4 Automatic air bleed valve 5 Stainless steel tank 6 Inlet Group consistis of 6 bar safety valve Non return valve Resume 22 reducing valve 22 mm balanced take off 7 Dielectric sleeve 8 DHW sensor 9 Drain valve 10 Non return valve 11 Polyuret...

Page 6: ...ry circuit Ensure the secondary circuit is full before he primary circuit Ensure the secondary circuit is full before he primary circuit Ensure the secondary circuit is full before filling the primary circuit filling the primary circuit filling the primary circuit filling the primary circuit To prevent heat losses through the hot water pipes in storage systems an anti thermosyphon should be instal...

Page 7: ...the primary circuit and then later the secondary IMPORTANT The IMPORTANT The IMPORTANT The IMPORTANT The HTP HTP HTP HTP must be connected to a public mains water must be connected to a public mains water must be connected to a public mains water must be connected to a public mains water supply supply supply supply through the Inlet Control through the Inlet Control through the Inlet Control throu...

Page 8: ...es of the boiler and on the Ensure the height of the elliptical holes on the sides of the boiler and on the rese rese rese reserve tank coincide for correct insertion of the feed auger To do this make the rve tank coincide for correct insertion of the feed auger To do this make the rve tank coincide for correct insertion of the feed auger To do this make the rve tank coincide for correct insertion...

Page 9: ...MPORTANT IMPORTANT To facilitate the servicing interior cleaning and if necessary replacement of the To facilitate the servicing interior cleaning and if necessary replacement of the To facilitate the servicing interior cleaning and if necessary replacement of the To facilitate the servicing interior cleaning and if necessary replacement of the heating element flange there must be a free space to ...

Page 10: ... tank will then be able to activate the boiler DHW demand function If any metal hydraulic pipes are installed copper iron etc an earth connection must be made The electrical installation must comply with all national and local laws and regulations concerning electrical installations applicable at the time and place of installation 2 4 2 4 2 4 2 4 Electrical installation of the RESISTOR KIT Electri...

Page 11: ...9 9 9 9 For installing the power supply cable not supplied with the kit we suggest a cable section equal to or greater than 1 mm2 The steps to follow for installing the Resistor Kit are shown below ...

Page 12: ...W tank to prevent its premature deterioration DOMUSA DOMUSA DOMUSA DOMUSA supplies an optional electronic cathodic protection suitable for the HTP HTP HTP HTP range of tanks For its correct installation carefully read the assembly instructions 2 7 2 7 2 7 2 7 Characteristics of the water Characteristics of the water Characteristics of the water Characteristics of the water The water must comply wi...

Page 13: ...he storage tank design respects the water stratification thereby maintaining the highest available volume of hot water Furthermore thanks to the high density polyurethane thermal insulation between the inner container and the outer casing any heat leaks are limited thus reducing energy consumption in the home All models support the installation a sheathed steatite electrical resistor with cathodic...

Page 14: ...fety valve and the drain valve If the system has been idle for a long period of time ensure that the storage tank loading pump works properly To do this remove the front cover of the pump leaving the pump shaft exposed If the shaft does not rotate turn the pump off by the pump switch With a suitable screwdriver lightly press the shaft and rotate it in both directions Turn the switch back on We rec...

Page 15: ... PUMP PUMP LIGHT LIGHT LIGHT LIGHT DESCRIPTION DESCRIPTION DESCRIPTION DESCRIPTION STATUS STATUS STATUS STATUS CAUSE CAUSE CAUSE CAUSE SOLUTION SOLUTION SOLUTION SOLUTION It is lit green The pump is functioning The pump operates according to its setting Standard functioning 1 Low voltage U 160 V or Excess voltage U 253 V 1 Check the power supply 195 V U 253 V It flashes red green The is ready for ...

Page 16: ...8 1 8 1 8 1 8 1 HTP 100 HTP 100 HTP 100 HTP 100 150 and HTP 130 150 and HTP 130 150 and HTP 130 150 and HTP 130 200 tanks 200 tanks 200 tanks 200 tanks 478 1310 913 240 673 750 250 5 115 323 439 505 V VACS ES TR SP SS EP 1147 296 1172 1310 253 5 700 750 240 673 913 91 322 438 504 1242 296 1182 V VACS ES TR SP SS EP 99 61 94 182 349 78 154 172 ...

Page 17: ...2 12 12 SCHA010028 Plinth Pos Pos Pos Pos Code Code Code Code Designation Designation Designation Designation 1 1 1 13 3 3 3 SEPO001876 HTP Right side panel 100 150 1 1 1 14 4 4 4 CFOV000036 DHW expansion vessel 15 15 15 15 SCHA010049 Vessel support 16 16 16 16 CFOV000143 Yonos Pump para 6 17 17 17 17 CVAL000002 Fill valve 18 18 18 18 CFOV000024 Automatic air bleed valve 19 19 19 19 SCOB012777 Col...

Page 18: ...CFOV000036 DHW expansion vessel Pos Pos Pos Pos Code Code Code Code Designation Designation Designation Designation 15 15 15 15 SCHA010211 Vessel support 16 16 16 16 CFOV000143 Yonos Pump For 6 17 17 17 17 CVAL000002 Fill valve 18 18 18 18 CFOV000024 Automatic air bleed valve 19 19 19 19 SCOB012778 Cold inlet pipe 20 20 20 20 CVAL000034 Drain valve 21 21 21 21 CELC000300 DHW sensor 22 22 22 22 SCO...

Page 19: ... user 2 The annual service is not included in the terms of this guarantee 3 The commissioning The commissioning The commissioning The commissioning and annual service annual service annual service annual service are to be carried out by personnel authorised by Domusa Domusa Domusa Domusa 4 The commercial guar commercial guar commercial guar commercial guarantee antee antee antee will be null and v...

Page 20: ...HTP HTP HTP HTP 18 18 18 18 NOTES NOTES NOTES NOTES ...

Page 21: ...19 19 19 19 NOTE NOTE NOTE NOTE ...

Page 22: ...HTP HTP HTP HTP 20 20 20 20 NOTE NOTE NOTE NOTE ...

Page 23: ......

Page 24: ...Y OFFICES Apartado 95 Bº San Esteban s n 20730 AZPEITIA 20737 ERREZIL Guipúzcoa Telfs 34 943 813 899 Fax 34 943 815 666 www domusa es www domusa es www domusa es www domusa es DOMUSA reserves the right to make modifications of any kind to its product characteristics without prior notice CDOC001073 CDOC001073 02 16 ...

Reviews: