background image

29-31 Richland St. Kingsgrove. Sydney NSW 2208 Australia

Phone: 02 9554 9600     |     Fax: 02 9554 9433

[email protected]     |     www.domuslighting.com

Installation Manual

Note: 

 -The lamp must be installed by professional electrician

 

-Ensure the power supply is switched off before fitting this product

-Do not touch the lamp when in use

-Keep away from hot steam and corrosive gas

PROFAN-2

Date: 05/2018

Variant

Item No.

Description

60010

PROFAN-2

3 in 1 Bathroom Heater, 2x275W heat lamp. White finish.

Thank you for purchasing your new LED PROFAN-2, Please take the time to read and understand the instruction sheet below. Failure 

to do so may void warranty.

FOR YOUR SAFETY:

•  This product must be used only as described in this manual. Any other use not recommended by the manufacturer may cause fire, 

electric shock, or injury to persons. If you have questions, contact the manufacture or local agent.

•  All wiring must be carried out by a licensed electrician in accordance with all applicable national / local codes and standards. Also check 

with the local council regulations regarding installation of exhaust fans.

•  Ensure the power is OFF before the installation.

•  When cutting into the ceiling material, care must be taken to ensure you do not damage electrical wiring and other hidden utilities

•  The heater must be properly earthed/grounded.

•  The lamps are extremely hot when in use. Do not touch the lamps with any part of your body when in use. Allow all lamps to cool 

sufficiently before touching or replacement.

•  For the purpose of avoiding any fumes leaking into your bathroom, the duct for the heater must not be laid together with ducts for 

air-fuelled water heaters or other open-fire appliances.

•  Power cable used for wiring must be rated for a minimum 10A load.

IMPORTANT CONSIDERATIONS BEFORE INSTALLING

A few minutes planning can make a big difference to the installation time and also to your satisfaction with the function of your 

Bathroom Heater.

•  The unit must be installed in accordance with AS/NZS 3000, and all local building codes relating to damp locations.

•  Before commencing any cutting, check in the ceiling space that there are no obstructions such as ceiling joists and that there is sufficient 

height clearance (at least 220mm) for the housing. Check that the

•  electrical wiring can be routed form the wall switches to the mounting location.

•  Ceiling insulation should be kept well clear of the unit and all ducting equipment.

•  The unit should not be installed directly above a shower or bathtub.

•  The unit must not be installed where it will be subject to direct splashing.

•  Your Bathroom Heater is designed for installation in flat ceilings only. Don’t mount on a sloping ceiling or a vertical wall.

•  The InfraRed lamps are not designed to heat the entire room area, they provide instant heat to persons standing directly below them. 

Install your Bathroom Heater above the area where ‘drying off’ usually occurs.

•  Your Bathroom Heater is not been designed for extended periods of operation, as this could cause overheating and premature failure.

•  For the exhaust fan to work efficiently, replace air of a volume equivalent to what is being extracted must be able to enter the room. In 

general this air would be drawn under the door, or through a slightly open window. If the room is airtight, the fan will function poorly.

INSTALLATION

1.  Your Bathroom Heater has been designed for use on ceilings between 2.4 and 2.7m in height.

2.  The unit may be installed between joists using the built in clips. Alternatively the unit can be installed against a joist using a screw 

through the flange plate.

3.  Disassemble the unit before installation. Remove the heat lamps from your Bathroom Heater. Unfasten the fascia-retaining springs 

inside the housing. Unplug the LED at the connector and remove the fascia.

4.  Mark the ceiling with a pencil outline 430mm x 250mm, and cut out a hole in the ceiling at the chosen area. Make sure a distance 

between the edges and wall is no less than 400mm. There should be a minimum 220mm clearance above the unit.

5.  Before commencing any cutting, check in the ceiling space that there are no obstructions such as ceiling joists, cables or pipes.

Specifications

Voltage:

240V

LED Type:

1x12W LED Panel, Switchable

3000K - 800lm

3000K - 900lm

Noise:

48dB

Motor:

35W

Air Flow:

400m³/h

Switch:

3 Gang

IP Rating:

20

Motor Speed: 1100rpm

Warranty: 3 Year Replacement

Heat Lamp: 2x275W Infrared Fan Wheel:

Ø160mm

Duct size: Dia. 120mm

Reviews: