
Installation for internal circuit lining:
1. Take out the water tank from the bottom
ņ
;(Figure 3)
2. Remove the screws
ŋ
by using the screw driver, and then remove the front cover;(Figure 3)
3. Remove the screws
ň
, open the cover of the wire box
ʼn
,remove the power line, put the
prepared power down-lead through the middle hole, and connect to the terminal
Ň
.Please note
that do not misconnect L, N and ground;(Figure 3)
4. Put back the cover of wire box,front cover and the water tank.
Use direction:
1. Put hands into the notch, LCD screen lights up,the drying direction(19)reminds you to insert
hands to the bottom of the notch.
2. The hand dryer starts working when hands inserted, fan blip(18)runs, and timer(20)counts
down from 18 seconds.
3. Dry hands in 6-12 seconds.
4. Automatically stop working when done counting down;follow the direction again to make it
rework.
Maintenance:
1. Must unplug the hand dryer before clean;wring out the wet cloth before cleaning. Do not clean
the product with chemical or abrasive substances,e.g. retinol and alcohol,and do not use the
nylon brush. These may damage the paint finish.
2. Before use chemical cloth, please read its direction carefully.
3. Do not drench the product directly with any disinfectors.
BC 2011 User Manual www.dolphindispensers.co.uk
Cable
entry
point