Start-up phases
Original Operating Instructions
Platform SCP
2nd casting section
➤
Install the hydraulic system (see the section headed
"Hydraulic system").
➤
Start up the hydraulic unit.
➤
Extend the plunger rods of the hydraulic cylinders
one at a time, and fix them in place in the lower base
beam with cylinder bolts D80x215.
Make sure that the pivoting bearing is in the right
position.
➤
Secure each cylinder bolt D80x215 with a hexagon
bolt M10x100, a washer and a hexagon nut M10.
➤
Lift the platform to the next position (see the section
headed 'Typical sequence of lifting-phases').
➤
Lower base beam is pulled up.
➤
Remove the service towers from the outsides.
➤
Apply concrete release agent and set up one side of
the formwork.
➤
Adjust the formwork.
➤
Mount the Boxes for latch.
➤
Place the reinforcement.
➤
Close the formwork and tie it.
A
Hydraulic cylinder SCP
B
Lower base beam
C
Cylinder bolt D80x215
98058-418-01
A
B
C
98058-416-02
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...