System description
Original Operating Instructions
Platform SCP
Functional principle
Starting position
▪
The previous section has been cast.
▪
All ties have been removed.
▪
Formwork has been struck.
Platform is raised
▪
Platform travels upwards.
Lower base beam is pulled up
▪
The lifting operation is finished.
98058-409-01
98058-409-02
98058-409-03
☞
For detailed information on the lifting sequence,
see the section headed 'Typical sequence of
lifting-phases'.