Original Operating Instructions
Platform SCP
General remarks
157
999805802 - 03/2016
General remarks
Hydraulic system
The Platform
SCP is driven by a hydraulic branch-line
system.
The branch-line system with a stationary hydraulic unit
allows the entire Platform
SCP to be driven 'in sync'.
The hydraulic system is equipped with all necessary
electrical and hydraulic control and safety elements for
ensuring lasting safe operation.
☞
Important note:
Dirt in the hydraulic system leads to malfunc-
tions. The following measures prevent dirt from
entering the hydraulic system.
▪
Start up the hydraulic unit at least one hour
before the lifting operation begins.
▪
Do not disconnect the hydraulic hoses after
initial installation.
▪
Do not keep cylinders extended after lifting
the platform. Pull up the lower base beams
and brackets.
☞
Important note:
If the plunger rod is contaminated
(e.g. with concrete laitance):
▪
Carefully clean the plunger rod before
retracting the cylinders.
▪
Do not hit any objects against the plunger
rod.
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...